IAC logo
IAC Assessment: MO0283
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0283
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 2000
Principal Product Chemicals
NAICS n/a
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 32
Plant Area (Sq.Ft.) 70,000
Annual Production 45,000,000 Pounds
Production Hrs. Annual 2,040
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $222,825 4,898,300 kWh $0.05
Electricity Demand $19,979 830 kW-months/year $24.07
Electricity Fees $30,603 - $ -
Natural Gas $287,091 89,180 MMBtu $3.22
TOTAL ENERGY COSTS $560,958
RECOMMENDED SAVINGS* $31,095 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,722
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,608
Cost:
$3,457
$1,488 28,722 $120 5 - - - - $1,488
28,722
kWh
$120
5
kW-months/year
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,212
Cost:
$8,200
$8,562 165,299 $650 27 - - - - $8,562
165,299
kWh
$650
27
kW-months/year
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$594
Cost:
$122
$546 10,551 $48 2 - - - - $546
10,551
kWh
$48
2
kW-months/year
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$373
Cost:
$40
$349 6,741 $24 1 - - - - $349
6,741
kWh
$24
1
kW-months/year
-
-
lb
-
-
$
05: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$460
Cost:
$900
- - - - $460 60 - - -
-
kWh
-
-
kW-months/year
$460
60
lb
-
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$9,720
Cost:
-
- - - - - - $9,720 - -
-
kWh
-
-
kW-months/year
-
-
lb
$9,720
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$9,128
Cost:
$3,700
- - - - - - $9,128 - -
-
kWh
-
-
kW-months/year
-
-
lb
$9,128
-
$
TOTAL RECOMMENDED Savings:
$31,095
Cost:
$16,419
$10,945 211,313 $842 35 $460 60 $18,848 - $10,945
211,313
kWh
$842
35
kW-months/year
$460
60
lb
$18,848
-
$
TOTAL IMPLEMENTED Savings:
$30,722
Cost:
$16,379
$10,596 204,572 $818 34 $460 60 $18,848 - $10,596
204,572
kWh
$818
34
kW-months/year
$460
60
lb
$18,848
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes