Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 2000 |
Principal Product | Pressure Switches, Gas and Oil Valves |
NAICS | n/a |
SIC | 3822 - Environmental Controls |
Sales | $10,000,000-$50,000,000 |
# of Employees | 285 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 1,500,000 Pieces |
Production Hrs. Annual | 6,864 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $153,222 | 4,644,490 | kWh | $0.03 |
Electricity Demand | $60,818 | 954 | kW-months/year | $63.75 |
Electricity Fees | $10,299 | - | $ | - |
Natural Gas | $13,265 | 1,132 | MMBtu | $11.72 |
TOTAL ENERGY COSTS | $240,016 | |||
RECOMMENDED SAVINGS* | $25,304 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,677 Cost: $8,150 |
$2,848 | 80,891 | $829 | 13 | - | - | - | - |
$2,848 80,891 kWh |
$829 13 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,696 Cost: $4,565 |
$2,931 | 83,236 | $765 | 12 | - | - | - | - |
$2,931 83,236 kWh |
$765 12 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,921 Cost: $210 |
$1,538 | 43,669 | $383 | 6 | - | - | - | - |
$1,538 43,669 kWh |
$383 6 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $540 Cost: - |
- | - | - | - | $540 | 24,000 | - | - |
- - kWh |
- - kW-months/year |
$540 24,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $6,370 Cost: $900 |
- | - | - | - | - | - | $6,370 | - |
- - kWh |
- - kW-months/year |
- - lb |
$6,370 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.423 MOVE PRODUCT USING MECHANICAL MEANS |
Savings: $9,100 Cost: $6,000 |
- | - | - | - | - | - | $9,100 | - |
- - kWh |
- - kW-months/year |
- - lb |
$9,100 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $25,304 Cost: $19,825 |
$7,317 | 207,796 | $1,977 | 31 | $540 | 24,000 | $15,470 | - | $7,317 207,796 kWh |
$1,977 31 kW-months/year |
$540 24,000 lb |
$15,470 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes |