IAC Assessment: MO0284
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0284
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 2000
Principal Product Pressure Switches, Gas and Oil Valves
NAICS n/a
SIC 3822 - Environmental Controls
Sales $10,000,000-$50,000,000
# of Employees 285
Plant Area (Sq.Ft.) 80,000
Annual Production 1,500,000 Pieces
Production Hrs. Annual 6,864
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,222 4,644,490 kWh $0.03
Electricity Demand $60,818 954 kW-months/year $63.75
Electricity Fees $10,299 - $ -
Natural Gas $13,265 1,132 MMBtu $11.72
TOTAL ENERGY COSTS $240,016
RECOMMENDED SAVINGS* $25,304 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,677
Cost:
$8,150
$2,848 80,891 $829 13 - - - - $2,848
80,891
kWh
$829
13
kW-months/year
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,696
Cost:
$4,565
$2,931 83,236 $765 12 - - - - $2,931
83,236
kWh
$765
12
kW-months/year
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,921
Cost:
$210
$1,538 43,669 $383 6 - - - - $1,538
43,669
kWh
$383
6
kW-months/year
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$540
Cost:
-
- - - - $540 24,000 - - -
-
kWh
-
-
kW-months/year
$540
24,000
lb
-
-
$
05: 4.446 AUTOMATE FINISHING PROCESS Savings:
$6,370
Cost:
$900
- - - - - - $6,370 - -
-
kWh
-
-
kW-months/year
-
-
lb
$6,370
-
$
06: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$9,100
Cost:
$6,000
- - - - - - $9,100 - -
-
kWh
-
-
kW-months/year
-
-
lb
$9,100
-
$
TOTAL RECOMMENDED Savings:
$25,304
Cost:
$19,825
$7,317 207,796 $1,977 31 $540 24,000 $15,470 - $7,317
207,796
kWh
$1,977
31
kW-months/year
$540
24,000
lb
$15,470
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes