IAC Assessment: MO0291
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0291
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 2000
Principal Product Aluminum Die Casting and Stampings
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $5,000,000-$10,000,000
# of Employees 61
Plant Area (Sq.Ft.) 65,000
Annual Production 200,000 Pounds
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $202,150 4,609,906 kWh $0.04
Electricity Demand $17,572 888 kW-months/year $19.79
Electricity Fees $35,335 - $ -
Natural Gas $106,843 23,483 MMBtu $4.55
TOTAL ENERGY COSTS $371,447
RECOMMENDED SAVINGS* $22,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,223
Cost:
$4,990
$2,025 39,273 $198 10 - - - - - - $2,025
39,273
kWh
$198
10
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,559
Cost:
$4,310
$2,282 44,256 $277 14 - - - - - - $2,282
44,256
kWh
$277
14
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,253
Cost:
$169
$1,194 23,154 $59 3 - - - - - - $1,194
23,154
kWh
$59
3
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,051
Cost:
-
$952 18,464 $99 5 - - - - - - $952
18,464
kWh
$99
5
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$3,000
Cost:
-
- - - - - - $3,000 3,000 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$3,000
3,000
lb
-
-
$
06: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$5,509
Cost:
$3,500
- - - - $5,509 2,800 - - - - -
-
kWh
-
-
kW-months/year
$5,509
2,800
gal
-
-
lb
-
-
$
07: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$6,075
Cost:
$500
- - - - - - - - $6,075 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$6,075
-
$
08: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,240
Cost:
$3,700
- - - - - - - - $1,240 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$1,240
-
$
TOTAL RECOMMENDED Savings:
$22,910
Cost:
$17,169
$6,453 125,147 $633 32 $5,509 2,800 $3,000 3,000 $7,315 - $6,453
125,147
kWh
$633
32
kW-months/year
$5,509
2,800
gal
$3,000
3,000
lb
$7,315
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Administrative Changes