IAC logo
IAC Assessment: MO0294
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0294
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 2000
Principal Product Yearbook Publishing
NAICS n/a
SIC 2732 - Book Printing
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 110,000
Annual Production 84,476,635 Pieces
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $186,511 4,544,549 kWh $0.04
Electricity Demand $77,841 960 kW-months/year $81.08
Electricity Fees $17,778 - $ -
Natural Gas $16,036 10,861 MMBtu $1.48
TOTAL ENERGY COSTS $308,546
RECOMMENDED SAVINGS* $91,769 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,229
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,306
Cost:
$14,543
$5,522 122,802 $1,784 22 - - - - $5,522
122,802
kWh
$1,784
22
kW-months/year
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,151
Cost:
$11,035
$7,908 175,850 $3,243 40 - - - - $7,908
175,850
kWh
$3,243
40
kW-months/year
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,717
Cost:
$339
$1,068 23,740 $649 8 - - - - $1,068
23,740
kWh
$649
8
kW-months/year
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,130
Cost:
$80
$725 16,120 $405 5 - - - - $725
16,120
kWh
$405
5
kW-months/year
-
-
lb
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,231
Cost:
-
$1,582 35,170 $649 8 - - - - $1,582
35,170
kWh
$649
8
kW-months/year
-
-
lb
-
-
$
06: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$5,864
Cost:
$5,785
- - - - $5,864 2,106 - - -
-
kWh
-
-
kW-months/year
$5,864
2,106
lb
-
-
$
07: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$5,670
Cost:
$4,000
- - - - - - $5,670 - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,670
-
$
08: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$56,700
Cost:
$15,000
- - - - - - $56,700 - -
-
kWh
-
-
kW-months/year
-
-
lb
$56,700
-
$
TOTAL RECOMMENDED Savings:
$91,769
Cost:
$50,782
$16,805 373,682 $6,730 83 $5,864 2,106 $62,370 - $16,805
373,682
kWh
$6,730
83
kW-months/year
$5,864
2,106
lb
$62,370
-
$
TOTAL IMPLEMENTED Savings:
$16,229
Cost:
$11,454
$11,283 250,880 $4,946 61 - - - - $11,283
250,880
kWh
$4,946
61
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost