IAC logo
IAC Assessment: MS0003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1994
Principal Product boats
NAICS n/a
SIC 3732 - Boat Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 102
Plant Area (Sq.Ft.) 250,000
Annual Production 6,000 Pieces
Production Hrs. Annual 2,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,965 1,475,381 kWh $0.08
Natural Gas $19,992 4,695 MMBtu $4.26
TOTAL ENERGY COSTS $131,957
RECOMMENDED SAVINGS* $26,937 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,441
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,462
Cost:
$18,000
$9,912 84,115 $(-1,450) (-287) $9,912
84,115
kWh
$(-1,450)
(-287)
MMBtu
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,280
Cost:
-
$5,280 - - - $5,280
-
kWh
-
-
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,594
Cost:
$4,000
$2,760 100,234 $1,834 426 $2,760
100,234
kWh
$1,834
426
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,970
Cost:
$3,740
$2,970 32,825 - - $2,970
32,825
kWh
-
-
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,760
Cost:
$1,500
- - $2,760 642 -
-
kWh
$2,760
642
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,419
Cost:
$2,600
- - $1,419 330 -
-
kWh
$1,419
330
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,058
Cost:
$1,000
- - $1,058 246 -
-
kWh
$1,058
246
MMBtu
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$203
Cost:
-
$203 4,396 - - $203
4,396
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$191
Cost:
$161
$191 2,052 - - $191
2,052
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,937
Cost:
$31,001
$21,316 223,622 $5,621 1,357 $21,316
223,622
kWh
$5,621
1,357
MMBtu
TOTAL IMPLEMENTED Savings:
$8,441
Cost:
$3,901
$8,441 34,877 - - $8,441
34,877
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas