IAC logo
IAC Assessment: MS0014
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0014
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1994
Principal Product Furniture
NAICS n/a
SIC 2512 - Upholstered Household Furniture
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 414,500
Annual Production 275,000 Pieces
Production Hrs. Annual 6,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $173,626 2,832,356 kWh $0.06
Natural Gas $47,894 12,869 MMBtu $3.72
TOTAL ENERGY COSTS $221,520
RECOMMENDED SAVINGS* $129,955 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,817
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,900
Cost:
$3,570
$3,900 - - - - - $3,900
-
kWh
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,063
Cost:
$7,450
$4,063 79,426 - - - - $4,063
79,426
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$200
Cost:
$73
$200 3,810 - - - - $200
3,810
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,207
Cost:
$2,085
$8,207 190,211 - - - - $8,207
190,211
kWh
-
-
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$347
Cost:
$1,000
- - $347 74 - - -
-
kWh
$347
74
MMBtu
-
-
$
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$113,238
Cost:
$550,000
$69,972 815,944 $(-23,993) (-5,258) $67,259 - $69,972
815,944
kWh
$(-23,993)
(-5,258)
MMBtu
$67,259
-
$
TOTAL RECOMMENDED Savings:
$129,955
Cost:
$564,178
$86,342 1,089,391 $(-23,646) (-5,184) $67,259 - $86,342
1,089,391
kWh
$(-23,646)
(-5,184)
MMBtu
$67,259
-
$
TOTAL IMPLEMENTED Savings:
$12,817
Cost:
$10,608
$12,470 273,447 $347 74 - - $12,470
273,447
kWh
$347
74
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes