IAC logo
IAC Assessment: MS0019
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0019
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1995
Principal Product Men's Work Pants
NAICS n/a
SIC 2326 - Men's and Boys' Work Clothing
Sales $10,000,000-$50,000,000
# of Employees 500
Plant Area (Sq.Ft.) 45,000
Annual Production 4,147,200 Pieces
Production Hrs. Annual 3,800
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $187,616 3,184,056 kWh $0.06
Natural Gas $35,662 10,869 MMBtu $3.28
TOTAL ENERGY COSTS $223,278
RECOMMENDED SAVINGS* $19,029 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,775
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,016
Cost:
$10,000
- - $5,016 1,520 -
-
kWh
$5,016
1,520
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,174
Cost:
$3,750
$5,174 - - - $5,174
-
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,539
Cost:
$500
$1,539 24,326 - - $1,539
24,326
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,429
Cost:
$1,436
$4,429 66,237 - - $4,429
66,237
kWh
-
-
MMBtu
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,563
Cost:
-
$1,563 21,102 - - $1,563
21,102
kWh
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$675
Cost:
$1,540
$361 11,137 $314 95 $361
11,137
kWh
$314
95
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$633
Cost:
$1,800
$633 6,155 - - $633
6,155
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$19,029
Cost:
$19,026
$13,699 128,957 $5,330 1,615 $13,699
128,957
kWh
$5,330
1,615
MMBtu
TOTAL IMPLEMENTED Savings:
$11,775
Cost:
$7,486
$11,775 96,718 - - $11,775
96,718
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas