IAC Assessment: MS0049
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0049
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product wiring harnesses
NAICS n/a
SIC 3694 - Engine Electrical Equipment
Sales $50,000,000-$100,000,000
# of Employees 530
Plant Area (Sq.Ft.) 55,000
Annual Production 360,000 Pieces
Production Hrs. Annual 4,420
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,204 2,209,848 kWh $0.04
Electricity Demand $45,794 5,359 kW-months/year $8.55
Electricity Fees $2,317 - $ -
LPG $1,432 267 MMBtu $5.36
TOTAL ENERGY COSTS $(-29,753)
RECOMMENDED SAVINGS* $441,160 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,659
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,933
Cost:
$6,695
$2,379 78,546 $2,554 232 - - - - - - - - $2,379
78,546
kWh
$2,554
232
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,936
Cost:
$5,000
$1,936 63,892 - - - - - - - - - - $1,936
63,892
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$790
Cost:
$570
$790 26,084 - - - - - - - - - - $790
26,084
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,838
Cost:
$80
$924 30,481 $914 83 - - - - - - - - $924
30,481
kWh
$914
83
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
05: 2.7227 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY Savings:
$2,389
Cost:
$5,280
$1,519 50,117 $870 79 - - - - - - - - $1,519
50,117
kWh
$870
79
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,144
Cost:
$900
- - - - $1,144 - - - - - - - -
-
kWh
-
-
kW-months/year
$1,144
-
$
-
-
lb
-
-
$
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$428,130
Cost:
$50,000
- - - - - - $(-30,870) 63,000 $(-45,000) - $504,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$(-30,870)
63,000
lb
$(-45,000)
-
$
$504,000
-
$
TOTAL RECOMMENDED Savings:
$441,160
Cost:
$68,525
$7,548 249,120 $4,338 394 $1,144 - $(-30,870) 63,000 $(-45,000) - $504,000 - $7,548
249,120
kWh
$4,338
394
kW-months/year
$1,144
-
$
$(-30,870)
63,000
lb
$(-45,000)
-
$
$504,000
-
$
TOTAL IMPLEMENTED Savings:
$7,659
Cost:
$12,265
$5,105 168,522 $2,554 232 - - - - - - - - $5,105
168,522
kWh
$2,554
232
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Primary Raw Material