IAC logo
IAC Assessment: MS0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1997
Principal Product Office Furniture
NAICS n/a
SIC 2531 - Public Building & Related Furniture
Sales $50,000,000-$100,000,000
# of Employees 575
Plant Area (Sq.Ft.) 600,000
Annual Production 4,556,471 Pieces
Production Hrs. Annual 6,240
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $390,065 12,326,788 kWh $0.03
Electricity Demand $231,434 29,231 kW-months/year $7.92
Electricity Fees $17,177 - $ -
Natural Gas $269,340 75,661 MMBtu $3.56
TOTAL ENERGY COSTS $1,263,103
RECOMMENDED SAVINGS* $290,047 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $101,230
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (haz) Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (haz) Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ Tgal
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$26,582
Cost:
$9,750
- - - - $26,582 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$26,582
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,674
Cost:
$14,571
- - - - - - $8,674 2,437 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,674
2,437
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,715
Cost:
$38,711
$12,925 418,230 $7,790 862 - - - - - - - - - - $12,925
418,230
kWh
$7,790
862
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
04: 2.7122 DISCONNECT BALLASTS Savings:
$1,814
Cost:
$1,602
$1,159 37,515 $655 72 - - - - - - - - - - $1,159
37,515
kWh
$655
72
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,730
Cost:
$6,255
- - - - - - $2,730 806 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,730
806
MMBtu
-
-
gal
-
-
lb
-
-
Tgal
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$41,338
Cost:
$19,152
- - - - - - - - - - $41,338 3,120 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$41,338
3,120
lb
-
-
Tgal
07: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$45,259
Cost:
$8,955
$(-4,296) (-139,508) $(-2,173) (-268) - - - - - - - - $51,728 - $(-4,296)
(-139,508)
kWh
$(-2,173)
(-268)
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
$51,728
-
Tgal
08: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$142,935
Cost:
$162,000
- - $(-4,566) (-502) - - - - $147,501 58,590 - - - - -
-
kWh
$(-4,566)
(-502)
kW-months/year
-
-
$
-
-
MMBtu
$147,501
58,590
gal
-
-
lb
-
-
Tgal
TOTAL RECOMMENDED Savings:
$290,047
Cost:
$260,996
$9,788 316,237 $1,706 164 $26,582 - $11,404 3,243 $147,501 58,590 $41,338 3,120 $51,728 - $9,788
316,237
kWh
$1,706
164
kW-months/year
$26,582
-
$
$11,404
3,243
MMBtu
$147,501
58,590
gal
$41,338
3,120
lb
$51,728
-
Tgal
TOTAL IMPLEMENTED Savings:
$101,230
Cost:
$71,987
$8,629 278,722 $5,617 594 $26,582 - $8,674 2,437 - - - - $51,728 - $8,629
278,722
kWh
$5,617
594
kW-months/year
$26,582
-
$
$8,674
2,437
MMBtu
-
-
gal
-
-
lb
$51,728
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (haz) Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (haz) Water Consumption