IAC logo
IAC Assessment: MS0113
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0113
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1998
Principal Product Battery Components
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 150,000
Annual Production 12,500,000 Pounds
Production Hrs. Annual 7,344
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $512,246 16,691,970 kWh $0.03
Electricity Demand $298,526 32,172 kW-months/year $9.28
Electricity Fees $14,476 - $ -
Natural Gas $43,357 8,226 MMBtu $5.27
TOTAL ENERGY COSTS $894,195
RECOMMENDED SAVINGS* $110,363 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,432
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,208
Cost:
$9,250
$6,244 204,865 $3,813 398 $151 - - - - - $6,244
204,865
kWh
$3,813
398
kW-months/year
$151
-
$
-
-
gal
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,045
Cost:
$8,030
$3,986 130,715 - - $59 - - - - - $3,986
130,715
kWh
-
-
kW-months/year
$59
-
$
-
-
gal
-
-
$
03: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$10,852
Cost:
$7,236
$10,692 350,821 - - $160 - - - - - $10,692
350,821
kWh
-
-
kW-months/year
$160
-
$
-
-
gal
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,323
Cost:
$4,875
- - - - $11,323 - - - - - -
-
kWh
-
-
kW-months/year
$11,323
-
$
-
-
gal
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$70,934
Cost:
$513,675
$67,021 2,198,124 $2,864 299 $1,049 - - - - - $67,021
2,198,124
kWh
$2,864
299
kW-months/year
$1,049
-
$
-
-
gal
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,049
Cost:
$1,235
- - - - - - - - $1,049 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
$1,049
-
$
07: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,952
Cost:
$2,745
$1,430 46,893 - - $22 - $500 2,700 - - $1,430
46,893
kWh
-
-
kW-months/year
$22
-
$
$500
2,700
gal
-
-
$
TOTAL RECOMMENDED Savings:
$110,363
Cost:
$547,046
$89,373 2,931,418 $6,677 697 $12,764 - $500 2,700 $1,049 - $89,373
2,931,418
kWh
$6,677
697
kW-months/year
$12,764
-
$
$500
2,700
gal
$1,049
-
$
TOTAL IMPLEMENTED Savings:
$33,432
Cost:
$22,596
$16,936 555,686 $3,813 398 $11,634 - - - $1,049 - $16,936
555,686
kWh
$3,813
398
kW-months/year
$11,634
-
$
-
-
gal
$1,049
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Ancillary Material Cost