IAC logo
IAC Assessment: MS0183
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0183
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2001
Principal Product Upholstered Furniture
NAICS n/a
SIC 2531 - Public Building & Related Furniture
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 100,000
Annual Production 50,000 Pieces
Production Hrs. Annual 2,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,518 784,200 kWh $0.05
Electricity Demand $28,914 5,268 kW-months/year $5.49
Electricity Fees $8,433 - $ -
Natural Gas $23,422 2,316 MMBtu $10.11
TOTAL ENERGY COSTS $111,670
RECOMMENDED SAVINGS* $12,342 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (haz) Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (haz)
$ kWh $ kW-months/year $ $ $ Tgal $ lb
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,236
Cost:
$8,235
- - - - $7,236 - - - - - -
-
kWh
-
-
kW-months/year
$7,236
-
$
-
-
Tgal
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,000
Cost:
$190
$985 29,721 - - $15 - - - - - $985
29,721
kWh
-
-
kW-months/year
$15
-
$
-
-
Tgal
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$142
Cost:
$230
$140 4,212 - - $2 - - - - - $140
4,212
kWh
-
-
kW-months/year
$2
-
$
-
-
Tgal
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$711
Cost:
$2,074
$214 6,443 $487 55 $10 - - - - - $214
6,443
kWh
$487
55
kW-months/year
$10
-
$
-
-
Tgal
-
-
lb
05: 3.1193 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING Savings:
$1,957
Cost:
$432
- - - - - - - - $1,957 468 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$1,957
468
lb
06: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$1,296
Cost:
$50
- - - - - - $1,296 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,296
-
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$12,342
Cost:
$11,211
$1,339 40,376 $487 55 $7,263 - $1,296 - $1,957 468 $1,339
40,376
kWh
$487
55
kW-months/year
$7,263
-
$
$1,296
-
Tgal
$1,957
468
lb
TOTAL IMPLEMENTED Savings:
$1,000
Cost:
$190
$985 29,721 - - $15 - - - - - $985
29,721
kWh
-
-
kW-months/year
$15
-
$
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ lb
Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (haz) Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (haz)