IAC logo
IAC Assessment: MS0243
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0243
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2004
Principal Product Cheese
NAICS 311513 - Cheese Manufacturing
SIC 2022 - Cheese, Natural And Processed
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 144,000
Annual Production 47,200,000 Pounds
Production Hrs. Annual 6,240
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $182,134 5,336,000 kWh $0.03
Electricity Demand $72,566 9,259 kW-months/year $7.84
Electricity Fees $4,125 - $ -
Natural Gas $74,091 8,342 MMBtu $8.88
TOTAL ENERGY COSTS $352,319
RECOMMENDED SAVINGS* $30,202 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$10,578
Cost:
$12,948
- - - - - - $10,578 1,191 -
-
kWh
-
-
kW-months/year
-
-
$
$10,578
1,191
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,144
Cost:
$10,559
$4,075 112,641 $1,978 236 $91 - - - $4,075
112,641
kWh
$1,978
236
kW-months/year
$91
-
$
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,790
Cost:
-
$3,127 94,106 $1,592 190 $71 - - - $3,127
94,106
kWh
$1,592
190
kW-months/year
$71
-
$
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,691
Cost:
$1,256
- - - - - - $4,691 528 -
-
kWh
-
-
kW-months/year
-
-
$
$4,691
528
MMBtu
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$3,385
Cost:
-
- - $3,335 398 $50 - - - -
-
kWh
$3,335
398
kW-months/year
$50
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$614
Cost:
$114
$605 18,205 - - $9 - - - $605
18,205
kWh
-
-
kW-months/year
$9
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,202
Cost:
$24,877
$7,807 224,952 $6,905 824 $221 - $15,269 1,719 $7,807
224,952
kWh
$6,905
824
kW-months/year
$221
-
$
$15,269
1,719
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas