IAC logo
IAC Assessment: MS0246
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0246
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2004
Principal Product Catfish
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $50,000,000-$100,000,000
# of Employees 715
Plant Area (Sq.Ft.) 154,510
Annual Production 35,000,000 Pounds
Production Hrs. Annual 2,340
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $764,508 15,953,352 kWh $0.05
Electricity Demand $195,280 41,143 kW-months/year $4.75
Electricity Fees $122,613 - $ -
Natural Gas $12,409 1,538 MMBtu $8.07
LPG $7,183 631 MMBtu $11.38
TOTAL ENERGY COSTS $1,101,993
RECOMMENDED SAVINGS* $61,040 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,284
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Electricity Usage Electricity Demand Electricity Fees LPG
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$29,186
Cost:
$4,860
$23,744 526,254 - - $5,442 - - - $23,744
526,254
kWh
-
-
kW-months/year
$5,442
-
$
-
-
MMBtu
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$10,266
Cost:
$1,600
$5,552 134,784 $2,208 691 $2,506 - - - $5,552
134,784
kWh
$2,208
691
kW-months/year
$2,506
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,360
Cost:
$25,987
$6,138 133,880 $819 184 $1,403 - - - $6,138
133,880
kWh
$819
184
kW-months/year
$1,403
-
$
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,631
Cost:
$10,887
$5,518 123,573 $698 169 $1,415 - - - $5,518
123,573
kWh
$698
169
kW-months/year
$1,415
-
$
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,754
Cost:
$1,328
$979 23,108 $412 118 $363 - - - $979
23,108
kWh
$412
118
kW-months/year
$363
-
$
-
-
MMBtu
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,216
Cost:
-
- - $1,003 314 $213 - - - -
-
kWh
$1,003
314
kW-months/year
$213
-
$
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,054
Cost:
$158
$795 19,306 - - $259 - - - $795
19,306
kWh
-
-
kW-months/year
$259
-
$
-
-
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$868
Cost:
$1,063
$655 15,903 - - $213 - - - $655
15,903
kWh
-
-
kW-months/year
$213
-
$
-
-
MMBtu
09: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$529
Cost:
$75
- - - - - - $529 - -
-
kWh
-
-
kW-months/year
-
-
$
$529
-
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$176
Cost:
$407
$89 2,160 $48 15 $39 - - - $89
2,160
kWh
$48
15
kW-months/year
$39
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$61,040
Cost:
$46,365
$43,470 978,968 $5,188 1,491 $11,853 - $529 - $43,470
978,968
kWh
$5,188
1,491
kW-months/year
$11,853
-
$
$529
-
MMBtu
TOTAL IMPLEMENTED Savings:
$31,284
Cost:
$6,488
$25,283 563,623 $48 15 $5,953 - - - $25,283
563,623
kWh
$48
15
kW-months/year
$5,953
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees LPG Electricity Usage Electricity Demand Electricity Fees LPG