IAC Assessment: MS0253
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0253
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2004
Principal Product Belt Conveyor Idlers
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 63
Plant Area (Sq.Ft.) 146,232
Annual Production 9,000,000 Pounds
Production Hrs. Annual 1,920
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,789 1,180,200 kWh $0.06
Electricity Demand $13,269 6,349 kW-months/year $2.09
Electricity Fees $1,309 - $ -
Natural Gas $30,793 6,349 MMBtu $4.85
TOTAL ENERGY COSTS $117,482
RECOMMENDED SAVINGS* $9,777 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,577
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,032
Cost:
$11
$3,213 58,109 $759 363 $60 - - - - - - - - - $3,213
58,109
kWh
$759
363
kW-months/year
$60
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,649
Cost:
$4,689
$1,316 23,792 $309 148 $24 - - - - - - - - - $1,316
23,792
kWh
$309
148
kW-months/year
$24
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,526
Cost:
$4,000
- - - - - - $1,526 182 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,526
182
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$853
Cost:
$288
$840 15,184 - - $13 - - - - - - - - - $840
15,184
kWh
-
-
kW-months/year
$13
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$703
Cost:
$2,190
- - - - - - $303 31 $400 275 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$303
31
MMBtu
$400
275
gal
-
-
lb
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$480
Cost:
$708
$473 8,548 - - $7 - - - - - - - - - $473
8,548
kWh
-
-
kW-months/year
$7
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 3.1193 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING Savings:
$336
Cost:
$68
- - - - - - - - - - $224 - $112 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$224
-
lb
$112
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$198
Cost:
$735
$157 2,840 $38 18 $3 - - - - - - - - - $157
2,840
kWh
$38
18
kW-months/year
$3
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$9,777
Cost:
$12,689
$5,999 108,473 $1,106 529 $107 - $1,829 213 $400 275 $224 - $112 - $5,999
108,473
kWh
$1,106
529
kW-months/year
$107
-
$
$1,829
213
MMBtu
$400
275
gal
$224
-
lb
$112
-
$
TOTAL IMPLEMENTED Savings:
$2,577
Cost:
$5,023
$997 18,024 $38 18 $16 - $1,526 182 - - - - - - $997
18,024
kWh
$38
18
kW-months/year
$16
-
$
$1,526
182
MMBtu
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) One-time Revenue or Avoided Cost