IAC logo
IAC Assessment: MS0282
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0282
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2005
Principal Product Veneer
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2435 - Hardwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 232,000
Annual Production 5,700 Thousand Feet
Production Hrs. Annual 6,240
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $147,982 3,318,084 kWh $0.04
Electricity Demand $34,329 10,654 kW-months/year $3.22
Electricity Fees $66,024 - $ -
TOTAL ENERGY COSTS $248,335
RECOMMENDED SAVINGS* $244,736 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$219,363
Cost:
$472,500
$311,155 6,991,920 $32,934 16,200 $114,474 - $(-239,200) - $311,155
6,991,920
kWh
$32,934
16,200
kW-months/year
$114,474
-
$
$(-239,200)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,947
Cost:
$22,298
$7,245 169,126 $1,038 325 $2,664 - - - $7,245
169,126
kWh
$1,038
325
kW-months/year
$2,664
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,573
Cost:
$11,233
$4,188 97,775 $802 251 $1,583 - - - $4,188
97,775
kWh
$802
251
kW-months/year
$1,583
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,467
Cost:
$4,140
$1,543 36,027 $332 104 $592 - - - $1,543
36,027
kWh
$332
104
kW-months/year
$592
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,337
Cost:
$7,721
$1,545 36,060 $224 70 $568 - - - $1,545
36,060
kWh
$224
70
kW-months/year
$568
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,990
Cost:
$203
$1,488 34,739 - - $502 - - - $1,488
34,739
kWh
-
-
kW-months/year
$502
-
$
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,059
Cost:
$236
$792 18,498 - - $267 - - - $792
18,498
kWh
-
-
kW-months/year
$267
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$244,736
Cost:
$518,331
$327,956 7,384,145 $35,330 16,950 $120,650 - $(-239,200) - $327,956
7,384,145
kWh
$35,330
16,950
kW-months/year
$120,650
-
$
$(-239,200)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost