Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2010
Principal Product CIRCUIT BOARDS
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 143
Plant Area (Sq.Ft.) 350,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 4,420
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $447,885 7,329,744 kWh $0.06
Electricity Demand $234,986 18,024 kW-months/year $13.04
Natural Gas $33,868 3,123 MMBtu $10.84
TOTAL ENERGY COSTS $716,739
RECOMMENDED SAVINGS* $105,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$92,249
Cost:
$34,416
$51,565 971,820 $39,321 2,639 $1,363 - $51,565
971,820
kWh
$39,321
2,639
kW-months/year
$1,363
-
$
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$6,626
Cost:
$5,300
$6,528 123,023 - - $98 - $6,528
123,023
kWh
-
-
kW-months/year
$98
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,061
Cost:
$389
$3,016 56,833 - - $45 - $3,016
56,833
kWh
-
-
kW-months/year
$45
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,750
Cost:
$9,711
$1,832 334,522 $1,863 125 $55 - $1,832
334,522
kWh
$1,863
125
kW-months/year
$55
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$284
Cost:
$393
$280 5,270 - - $4 - $280
5,270
kWh
-
-
kW-months/year
$4
-
$
TOTAL RECOMMENDED Savings:
$105,970
Cost:
$50,209
$63,221 1,491,468 $41,184 2,764 $1,565 - $63,221
1,491,468
kWh
$41,184
2,764
kW-months/year
$1,565
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $