IAC logo
IAC Assessment: MS0355
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0355
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2010
Principal Product CABLE PRODUCTS
NAICS 335929 - Other Communication and Energy Wire Manufacturing
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $100,000,000-$500,000,000
# of Employees 63
Plant Area (Sq.Ft.) 218,785
Annual Production 6,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,310 2,304,426 kWh $0.05
Electricity Demand $23,663 7,394 kW-months/year $3.20
Electricity Fees $22,273 - $ -
Natural Gas $34,726 4,021 MMBtu $8.64
TOTAL ENERGY COSTS $188,972
RECOMMENDED SAVINGS* $54,841 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,176
Cost:
$44,540
$24,731 511,971 $3,611 1,338 $2,834 - $24,731
511,971
kWh
$3,611
1,338
kW-months/year
$2,834
-
$
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$10,766
Cost:
$6,978
$8,874 183,717 $993 368 $899 - $8,874
183,717
kWh
$993
368
kW-months/year
$899
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$7,078
Cost:
$32,037
$5,522 114,306 $891 330 $665 - $5,522
114,306
kWh
$891
330
kW-months/year
$665
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,361
Cost:
$32,037
$2,696 55,822 - - $665 - $2,696
55,822
kWh
-
-
kW-months/year
$665
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,377
Cost:
$59,145
$1,302 26,952 - - $75 - $1,302
26,952
kWh
-
-
kW-months/year
$75
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$793
Cost:
$6,281
$526 10,883 $170 63 $97 - $526
10,883
kWh
$170
63
kW-months/year
$97
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$290
Cost:
$595
$239 4,942 $27 10 $24 - $239
4,942
kWh
$27
10
kW-months/year
$24
-
$
TOTAL RECOMMENDED Savings:
$54,841
Cost:
$181,613
$43,890 908,593 $5,692 2,109 $5,259 - $43,890
908,593
kWh
$5,692
2,109
kW-months/year
$5,259
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees