IAC logo
IAC Assessment: MS0356
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0356
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2010
Principal Product PLASTIC BAGS
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 75,000
Annual Production 11,000 Tons
Production Hrs. Annual 8,760
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $290,541 7,148,400 kWh $0.04
Electricity Demand $50,654 12,584 kW-months/year $4.03
Electricity Fees $83,044 - $ -
TOTAL ENERGY COSTS $424,239
RECOMMENDED SAVINGS* $41,283 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$24,993
Cost:
$19,250
$23,600 660,000 $263 75 $1,130 - $23,600
660,000
kWh
$263
75
kW-months/year
$1,130
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,215
Cost:
$14,101
$8,073 225,756 $1,082 309 $60 - $8,073
225,756
kWh
$1,082
309
kW-months/year
$60
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,623
Cost:
$4,140
$3,418 95,574 - - $205 - $3,418
95,574
kWh
-
-
kW-months/year
$205
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,080
Cost:
$418
$2,947 82,408 - - $133 - $2,947
82,408
kWh
-
-
kW-months/year
$133
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$372
Cost:
$119
$351 9,829 - - $21 - $351
9,829
kWh
-
-
kW-months/year
$21
-
$
TOTAL RECOMMENDED Savings:
$41,283
Cost:
$38,028
$38,389 1,073,567 $1,345 384 $1,549 - $38,389
1,073,567
kWh
$1,345
384
kW-months/year
$1,549
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $