IAC logo
IAC Assessment: MZ0023
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0023
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2008
Principal Product Electronic Connectors, optical lenses, RF tags, medical diagnostic produ
NAICS 334111 - Electronic Computer Manufacturing
SIC 3577 - Computer Peripheral Equipment, Nec
Sales $1,000,000-$5,000,000
# of Employees 250
Plant Area (Sq.Ft.) 175,000
Annual Production 300,000 Pieces
Production Hrs. Annual 4,335
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,640,509 42,499,780 kWh $0.06
Natural Gas $1,243,836 137,951 MMBtu $9.02
TOTAL ENERGY COSTS $3,884,345
RECOMMENDED SAVINGS* $96,643 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $89,605
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$183
Cost:
$80
- - - - $183 20 -
-
kWh
-
-
kW-months/year
$183
20
MMBtu
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$5,828
Cost:
$2,077
$4,328 97,017 $1,500 268 - - $4,328
97,017
kWh
$1,500
268
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$41,564
Cost:
$27,000
$41,564 215,536 - - - - $41,564
215,536
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,210
Cost:
$1,941
$1,210 18,213 - - - - $1,210
18,213
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$47,858
Cost:
$40,000
- - - - $47,858 5,287 -
-
kWh
-
-
kW-months/year
$47,858
5,287
MMBtu
TOTAL RECOMMENDED Savings:
$96,643
Cost:
$71,098
$47,102 330,766 $1,500 268 $48,041 5,307 $47,102
330,766
kWh
$1,500
268
kW-months/year
$48,041
5,307
MMBtu
TOTAL IMPLEMENTED Savings:
$89,605
Cost:
$67,080
$41,564 215,536 - - $48,041 5,307 $41,564
215,536
kWh
-
-
kW-months/year
$48,041
5,307
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas