IAC Assessment: MZ0048
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0048
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2010
Principal Product plastic containers and parts
NAICS 326121 - Unlaminated Plastics Profile Shape Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 70,000
Annual Production 37,000,000 Pounds
Production Hrs. Annual 8,500
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $710,525 17,040,000 kWh $0.04
Electricity Demand $403,625 36,850 kW-months/year $10.95
TOTAL ENERGY COSTS $1,114,150
RECOMMENDED SAVINGS* $136,540 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,217
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,738
Cost:
$3,000
- - $12,738 6,000 -
-
kWh
$12,738
6,000
kW-months/year
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,520
Cost:
$1,160
$4,520 56,402 - - $4,520
56,402
kWh
-
-
kW-months/year
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$36,058
Cost:
$92,296
$36,058 407,654 - - $36,058
407,654
kWh
-
-
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,649
Cost:
-
$3,649 52,137 - - $3,649
52,137
kWh
-
-
kW-months/year
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,639
Cost:
-
$5,639 80,568 - - $5,639
80,568
kWh
-
-
kW-months/year
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,307
Cost:
$5,859
$11,307 132,315 - - $11,307
132,315
kWh
-
-
kW-months/year
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$62,629
Cost:
$5,600
$62,629 817,306 - - $62,629
817,306
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$136,540
Cost:
$107,915
$123,802 1,546,382 $12,738 6,000 $123,802
1,546,382
kWh
$12,738
6,000
kW-months/year
TOTAL IMPLEMENTED Savings:
$46,217
Cost:
$93,456
$46,217 544,624 - - $46,217
544,624
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand