IAC Assessment: MZ0055
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0055
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2010
Principal Product aoto inerior products
NAICS 326121 - Unlaminated Plastics Profile Shape Manufacturing
SIC 3083 - Laminated Plastics Plate & Sheet
Sales $1,000,000-$5,000,000
# of Employees 32
Plant Area (Sq.Ft.) 140,000
Annual Production 24,000 Pieces
Production Hrs. Annual 2,210
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $186,700 1,629,000 kWh $0.11
Electricity Demand $224,193 11,520 kW-months/year $19.46
Natural Gas $97,279 8,943 MMBtu $10.88
TOTAL ENERGY COSTS $508,172
RECOMMENDED SAVINGS* $30,756 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,098
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,916
Cost:
$1,100
$2,470 22,457 $2,446 126 $2,470
22,457
kWh
$2,446
126
kW-months/year
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$770
Cost:
$700
$770 6,989 - - $770
6,989
kWh
-
-
kW-months/year
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,900
Cost:
$1,160
$2,500 22,661 $2,400 123 $2,500
22,661
kWh
$2,400
123
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,282
Cost:
$16,460
$5,755 52,320 $5,527 280 $5,755
52,320
kWh
$5,527
280
kW-months/year
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$8,888
Cost:
-
$4,533 41,216 $4,355 223 $4,533
41,216
kWh
$4,355
223
kW-months/year
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
07: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$30,756
Cost:
$19,420
$16,028 145,643 $14,728 752 $16,028
145,643
kWh
$14,728
752
kW-months/year
TOTAL IMPLEMENTED Savings:
$21,098
Cost:
$18,720
$10,725 97,438 $10,373 529 $10,725
97,438
kWh
$10,373
529
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand