Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2013 |
Principal Product | shampoo, personal care products |
NAICS | 325620 - Toilet Preparation Manufacturing |
SIC | 2844 - Toilet Preparations |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 600,000 |
Annual Production | 459,173,064 Pieces |
Production Hrs. Annual | 8,520 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,393,003 | 23,623,200 | kWh | $0.06 |
Electricity Demand | $120 | 12 | kW-months/year | $10.00 |
Natural Gas | $183,557 | 96,634 | MMBtu | $1.90 |
TOTAL ENERGY COSTS | $1,871,897 | |||
RECOMMENDED SAVINGS* | $242,550 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $100,799 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $0 Cost: - |
$0 | 1 | - | - | - | - | - | - |
$0 1 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $13,741 Cost: $16,000 |
$13,741 | 232,900 | - | - | - | - | - | - |
$13,741 232,900 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $57,890 Cost: $57,890 |
$46,734 | 792,104 | $11,156 | 1,116 | - | - | - | - |
$46,734 792,104 kWh |
$11,156 1,116 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,446 Cost: $1,300 |
$5,204 | 88,214 | $1,242 | 124 | - | - | - | - |
$5,204 88,214 kWh |
$1,242 124 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $5,595 Cost: - |
$2,606 | 44,166 | $605 | 61 | $2,384 | 1,255 | - | - |
$2,606 44,166 kWh |
$605 61 kW-months/year |
$2,384 1,255 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $17,597 Cost: $8,000 |
$14,219 | 241,004 | $3,378 | 338 | - | - | - | - |
$14,219 241,004 kWh |
$3,378 338 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,278 Cost: $4,500 |
- | - | - | - | $3,278 | 1,725 | - | - |
- - kWh |
- - kW-months/year |
$3,278 1,725 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER |
Savings: $55,500 Cost: $650,000 |
$12,000 | 203,390 | $6,000 | 600 | $37,500 | 19,737 | - | - |
$12,000 203,390 kWh |
$6,000 600 kW-months/year |
$37,500 19,737 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $0 Cost: - |
- | - | - | - | - | - | $0 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$0 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $9,000 Cost: - |
- | - | - | - | $9,000 | 4,737 | - | - |
- - kWh |
- - kW-months/year |
$9,000 4,737 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $12,000 Cost: - |
- | - | - | - | $12,000 | 6,315 | - | - |
- - kWh |
- - kW-months/year |
$12,000 6,315 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $38,737 Cost: $28,800 |
$38,737 | 656,554 | - | - | - | - | - | - |
$38,737 656,554 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $22,766 Cost: $60,580 |
$18,307 | 310,289 | $4,459 | 446 | - | - | - | - |
$18,307 310,289 kWh |
$4,459 446 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $242,550 Cost: $827,070 |
$151,548 | 2,568,622 | $26,840 | 2,685 | $64,162 | 33,769 | $0 | - | $151,548 2,568,622 kWh |
$26,840 2,685 kW-months/year |
$64,162 33,769 MMBtu |
$0 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $100,799 Cost: $58,600 |
$71,901 | 1,218,673 | $4,620 | 462 | $24,278 | 12,777 | - | - | $71,901 1,218,673 kWh |
$4,620 462 kW-months/year |
$24,278 12,777 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |