IAC Assessment: MZ0129
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2013
Principal Product railroad tank cars
NAICS 336510 - Railroad Rolling Stock Manufacturing
SIC 3743 - Railroad Equipment
Sales $100,000,000-$500,000,000
# of Employees 511
Plant Area (Sq.Ft.) 360,000
Annual Production 3,000 Pieces
Production Hrs. Annual 5,200
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,087,881 22,353,940 kWh $0.05
Electricity Demand $497,884 53,489 kW-months/year $9.31
Natural Gas $402,089 250,810 MMBtu $1.60
TOTAL ENERGY COSTS $1,987,854
RECOMMENDED SAVINGS* $202,709 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $137,985
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$56,550
Cost:
$18,200
$39,554 791,073 $16,996 1,826 - - $39,554
791,073
kWh
$16,996
1,826
kW-months/year
-
-
MMBtu
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$31,447
Cost:
$13,600
- - - - $31,447 16,675 -
-
kWh
-
-
kW-months/year
$31,447
16,675
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,082
Cost:
$1,800
$1,443 28,852 $639 69 - - $1,443
28,852
kWh
$639
69
kW-months/year
-
-
MMBtu
04: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$1,563
Cost:
$760
- - $1,563 168 - - -
-
kWh
$1,563
168
kW-months/year
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$20,763
Cost:
$63,637
$14,535 290,692 $6,228 669 - - $14,535
290,692
kWh
$6,228
669
kW-months/year
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$156
Cost:
-
$156 3,128 - - - - $156
3,128
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$47,580
Cost:
$267,500
$33,280 665,600 $14,300 1,536 - - $33,280
665,600
kWh
$14,300
1,536
kW-months/year
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$998
Cost:
$190
$998 19,968 - - - - $998
19,968
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$31,162
Cost:
$150,000
- - - - $31,162 19,440 -
-
kWh
-
-
kW-months/year
$31,162
19,440
MMBtu
10: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$1,959
Cost:
$600
$1,959 39,175 - - - - $1,959
39,175
kWh
-
-
kW-months/year
-
-
MMBtu
11: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$8,450
Cost:
-
$8,450 169,000 - - - - $8,450
169,000
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$202,709
Cost:
$516,287
$100,374 2,007,487 $39,726 4,267 $62,609 36,115 $100,374
2,007,487
kWh
$39,726
4,267
kW-months/year
$62,609
36,115
MMBtu
TOTAL IMPLEMENTED Savings:
$137,985
Cost:
$352,087
$98,259 1,965,185 $39,726 4,267 - - $98,259
1,965,185
kWh
$39,726
4,267
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas