IAC logo
IAC Assessment: MZ0164
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0164
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2014
Principal Product shelving, closets
NAICS 332618 - Other Fabricated Wire Product Manufacturing
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $100,000,000-$500,000,000
# of Employees 550
Plant Area (Sq.Ft.) 708,300
Annual Production 9,000,000 Pieces
Production Hrs. Annual 4,800
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $541,002 12,622,200 kWh $0.04
Electricity Demand $672,180 43,102 kW-months/year $15.60
Natural Gas $362,016 90,504 MMBtu $4.00
TOTAL ENERGY COSTS $1,620,644
RECOMMENDED SAVINGS* $408,983 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $407,239
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$188,887
Cost:
-
- - $188,887 12,112 - - -
-
kWh
$188,887
12,112
kW-months/year
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,744
Cost:
$1,500
- - - - $1,744 436 -
-
kWh
-
-
kW-months/year
$1,744
436
MMBtu
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$71,454
Cost:
-
$71,454 1,665,600 - - - - $71,454
1,665,600
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$24,203
Cost:
$100,000
$24,203 564,172 - - - - $24,203
564,172
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$13,593
Cost:
$6,500
$7,121 166,002 $6,472 415 - - $7,121
166,002
kWh
$6,472
415
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,200
Cost:
$1,430
$2,724 63,496 $2,476 159 - - $2,724
63,496
kWh
$2,476
159
kW-months/year
-
-
MMBtu
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$47,302
Cost:
$25,000
$24,783 577,689 $22,519 1,444 - - $24,783
577,689
kWh
$22,519
1,444
kW-months/year
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$56,600
Cost:
$384,000
$29,652 691,200 $26,948 1,728 - - $29,652
691,200
kWh
$26,948
1,728
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$408,983
Cost:
$518,430
$159,937 3,728,159 $247,302 15,858 $1,744 436 $159,937
3,728,159
kWh
$247,302
15,858
kW-months/year
$1,744
436
MMBtu
TOTAL IMPLEMENTED Savings:
$407,239
Cost:
$516,930
$159,937 3,728,159 $247,302 15,858 - - $159,937
3,728,159
kWh
$247,302
15,858
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas