IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2016
Principal Product Custom casework for residential and commercial applications
NAICS 337121 - Upholstered Household Furniture Manufacturing
SIC 2511 - Wood Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 83
Plant Area (Sq.Ft.) 280,000
Annual Production 200,000 Pieces
Production Hrs. Annual 2,100
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $278,203 3,763,200 kWh $0.07
Electricity Demand $86,483 13,356 kW-months/year $6.48
Natural Gas $86,159 10,696 MMBtu $8.06
TOTAL ENERGY COSTS $450,845
RECOMMENDED SAVINGS* $208,381 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,907
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$108,895
Cost:
$375,000
$62,489 845,582 $31,287 4,832 $15,119 1,877 $62,489
845,582
kWh
$31,287
4,832
kW-months/year
$15,119
1,877
MMBtu
02: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$8,491
Cost:
-
$4,140 56,000 $4,351 672 - - $4,140
56,000
kWh
$4,351
672
kW-months/year
-
-
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$19,426
Cost:
-
- - $19,426 3,000 - - -
-
kWh
$19,426
3,000
kW-months/year
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,717
Cost:
-
$1,144 15,477 $573 89 - - $1,144
15,477
kWh
$573
89
kW-months/year
-
-
MMBtu
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$12,192
Cost:
$12,000
$9,803 132,603 $2,389 309 - - $9,803
132,603
kWh
$2,389
309
kW-months/year
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,397
Cost:
$1,500
$931 12,599 $466 72 - - $931
12,599
kWh
$466
72
kW-months/year
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,703
Cost:
$930
$2,466 33,357 $1,237 191 - - $2,466
33,357
kWh
$1,237
191
kW-months/year
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$45,907
Cost:
$136,500
$30,593 413,826 $15,314 2,365 - - $30,593
413,826
kWh
$15,314
2,365
kW-months/year
-
-
MMBtu
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$6,653
Cost:
-
$6,653 90,000 - - - - $6,653
90,000
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$208,381
Cost:
$525,930
$118,219 1,599,444 $75,043 11,530 $15,119 1,877 $118,219
1,599,444
kWh
$75,043
11,530
kW-months/year
$15,119
1,877
MMBtu
TOTAL IMPLEMENTED Savings:
$45,907
Cost:
$136,500
$30,593 413,826 $15,314 2,365 - - $30,593
413,826
kWh
$15,314
2,365
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas