IAC logo
IAC Assessment: MZ0202
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0202
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2016
Principal Product Machine tools
NAICS 333517 - Machine Tool Manufacturing
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 208,000
Annual Production 1,000 Units
Production Hrs. Annual 5,800
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $248,851 3,940,000 kWh $0.06
Electricity Demand $90,222 11,639 kW-months/year $7.75
Natural Gas $43,812 9,963 MMBtu $4.40
TOTAL ENERGY COSTS $382,885
RECOMMENDED SAVINGS* $74,262 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$19,101
Cost:
$70,000
$14,869 235,416 $4,232 546 - - $14,869
235,416
kWh
$4,232
546
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,180
Cost:
$27,600
$13,699 216,891 $3,481 449 - - $13,699
216,891
kWh
$3,481
449
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,654
Cost:
$5,000
$5,305 84,000 $1,349 174 - - $5,305
84,000
kWh
$1,349
174
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,839
Cost:
$3,225
- - - - $3,839 873 -
-
kWh
-
-
kW-months/year
$3,839
873
MMBtu
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$9,678
Cost:
$45,000
$9,678 153,228 - - - - $9,678
153,228
kWh
-
-
kW-months/year
-
-
MMBtu
06: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$3,585
Cost:
-
$3,585 56,768 - - - - $3,585
56,768
kWh
-
-
kW-months/year
-
-
MMBtu
07: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$7,503
Cost:
-
$3,950 62,540 $1,209 156 $2,344 533 $3,950
62,540
kWh
$1,209
156
kW-months/year
$2,344
533
MMBtu
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,722
Cost:
$7,341
$5,156 81,630 $1,566 202 - - $5,156
81,630
kWh
$1,566
202
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$74,262
Cost:
$158,166
$56,242 890,473 $11,837 1,527 $6,183 1,406 $56,242
890,473
kWh
$11,837
1,527
kW-months/year
$6,183
1,406
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas