IAC logo
IAC Assessment: MZ0216
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0216
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2016
Principal Product Processed meat (ham, rib, bacon, sausage, seafood, lamb, and game birds)
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 140,000
Annual Production 15,000 Tons
Production Hrs. Annual 4,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,291 1,796,900 kWh $0.07
Electricity Demand $53,358 6,523 kW-months/year $8.18
Natural Gas $53,982 19,886 MMBtu $2.71
TOTAL ENERGY COSTS $228,631
RECOMMENDED SAVINGS* $8,026 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,778
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$859
Cost:
$1,000
$622 9,215 $237 29 - - $622
9,215
kWh
$237
29
kW-months/year
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,373
Cost:
$12,000
$4,373 64,784 - - - - $4,373
64,784
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$404
Cost:
$800
- - - - $404 149 -
-
kWh
-
-
kW-months/year
$404
149
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$389
Cost:
$280
$389 5,760 - - - - $389
5,760
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$2,001
Cost:
$2,000
- - - - $2,001 737 -
-
kWh
-
-
kW-months/year
$2,001
737
MMBtu
TOTAL RECOMMENDED Savings:
$8,026
Cost:
$16,080
$5,384 79,759 $237 29 $2,405 886 $5,384
79,759
kWh
$237
29
kW-months/year
$2,405
886
MMBtu
TOTAL IMPLEMENTED Savings:
$6,778
Cost:
$14,800
$4,373 64,784 - - $2,405 886 $4,373
64,784
kWh
-
-
kW-months/year
$2,405
886
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas