IAC Assessment: MZ0240
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0240
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2017
Principal Product Chrome plated bars and tubes
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 180,000
Annual Production 15,000 Units
Production Hrs. Annual 8,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $553,469 10,211,600 kWh $0.05
Electricity Demand $449,469 31,366 kW-months/year $14.33
Natural Gas $72,759 9,771 MMBtu $7.45
TOTAL ENERGY COSTS $1,075,697
RECOMMENDED SAVINGS* $163,451 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $162,645
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,020
Cost:
$6,000
- - - - $7,020 942 - - -
-
kWh
-
-
kW-months/year
$7,020
942
MMBtu
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,183
Cost:
$2,100
$5,346 99,100 $2,837 198 - - - - $5,346
99,100
kWh
$2,837
198
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,206
Cost:
$250
$5,206 96,404 - - - - - - $5,206
96,404
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$806
Cost:
$5,500
$806 14,926 - - - - - - $806
14,926
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 3.8124 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION Savings:
$7,139
Cost:
$5,400
- - - - $7,139 958 - - -
-
kWh
-
-
kW-months/year
$7,139
958
MMBtu
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,745
Cost:
$1,160
$2,745 50,830 - - - - - - $2,745
50,830
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
07: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$119,328
Cost:
$208,000
$207,360 3,840,000 $137,568 9,600 - - $(-225,600) (-30,282) $207,360
3,840,000
kWh
$137,568
9,600
kW-months/year
-
-
MMBtu
$(-225,600)
(-30,282)
MMBtu
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$13,024
Cost:
$70,500
$8,510 157,500 $4,514 315 - - - - $8,510
157,500
kWh
$4,514
315
kW-months/year
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$163,451
Cost:
$298,910
$229,973 4,258,760 $144,919 10,113 $14,159 1,900 $(-225,600) (-30,282) $229,973
4,258,760
kWh
$144,919
10,113
kW-months/year
$14,159
1,900
MMBtu
$(-225,600)
(-30,282)
MMBtu
TOTAL IMPLEMENTED Savings:
$162,645
Cost:
$293,410
$229,167 4,243,834 $144,919 10,113 $14,159 1,900 $(-225,600) (-30,282) $229,167
4,243,834
kWh
$144,919
10,113
kW-months/year
$14,159
1,900
MMBtu
$(-225,600)
(-30,282)
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2