Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2017 |
Principal Product | Chrome plated bars and tubes |
NAICS | 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471 - Plating And Polishing |
Sales | $10,000,000-$50,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 15,000 Units |
Production Hrs. Annual | 8,000 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $553,469 | 10,211,600 | kWh | $0.05 |
Electricity Demand | $449,469 | 31,366 | kW-months/year | $14.33 |
Natural Gas | $72,759 | 9,771 | MMBtu | $7.45 |
TOTAL ENERGY COSTS | $1,075,697 | |||
RECOMMENDED SAVINGS* | $163,451 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $162,645 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $7,020 Cost: $6,000 |
- | - | - | - | $7,020 | 942 | - | - |
- - kWh |
- - kW-months/year |
$7,020 942 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $8,183 Cost: $2,100 |
$5,346 | 99,100 | $2,837 | 198 | - | - | - | - |
$5,346 99,100 kWh |
$2,837 198 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,206 Cost: $250 |
$5,206 | 96,404 | - | - | - | - | - | - |
$5,206 96,404 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $806 Cost: $5,500 |
$806 | 14,926 | - | - | - | - | - | - |
$806 14,926 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.8124 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION |
Savings: $7,139 Cost: $5,400 |
- | - | - | - | $7,139 | 958 | - | - |
- - kWh |
- - kW-months/year |
$7,139 958 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,745 Cost: $1,160 |
$2,745 | 50,830 | - | - | - | - | - | - |
$2,745 50,830 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS |
Savings: $119,328 Cost: $208,000 |
$207,360 | 3,840,000 | $137,568 | 9,600 | - | - | $(-225,600) | (-30,282) |
$207,360 3,840,000 kWh |
$137,568 9,600 kW-months/year |
- - MMBtu |
$(-225,600) (-30,282) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $13,024 Cost: $70,500 |
$8,510 | 157,500 | $4,514 | 315 | - | - | - | - |
$8,510 157,500 kWh |
$4,514 315 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $163,451 Cost: $298,910 |
$229,973 | 4,258,760 | $144,919 | 10,113 | $14,159 | 1,900 | $(-225,600) | (-30,282) | $229,973 4,258,760 kWh |
$144,919 10,113 kW-months/year |
$14,159 1,900 MMBtu |
$(-225,600) (-30,282) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $162,645 Cost: $293,410 |
$229,167 | 4,243,834 | $144,919 | 10,113 | $14,159 | 1,900 | $(-225,600) | (-30,282) | $229,167 4,243,834 kWh |
$144,919 10,113 kW-months/year |
$14,159 1,900 MMBtu |
$(-225,600) (-30,282) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 |