Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2017
Principal Product automotive parts and assemblies
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 651
Plant Area (Sq.Ft.) 350,000
Annual Production 6,000,000 Units
Production Hrs. Annual 4,080
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,021,089 10,584,600 kWh $0.10
Electricity Demand $117,049 24,540 kW-months/year $4.77
Natural Gas $65,335 9,602 MMBtu $6.80
TOTAL ENERGY COSTS $1,203,472
RECOMMENDED SAVINGS* $209,339 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $136,933
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$326
Cost:
-
$326 3,436 - - - - - - $326
3,436
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$1,238
Cost:
$3,570
- - - - $1,238 182 - - -
-
kWh
-
-
kW-months/year
$1,238
182
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,547
Cost:
$4,050
- - - - $2,547 374 - - -
-
kWh
-
-
kW-months/year
$2,547
374
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,218
Cost:
$1,820
$2,822 28,223 $396 83 - - - - $2,822
28,223
kWh
$396
83
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$34,321
Cost:
$100,150
$16,678 173,726 $2,437 511 - - $15,206 - $16,678
173,726
kWh
$2,437
511
kW-months/year
-
-
MMBtu
$15,206
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,151
Cost:
$4,125
$381 3,966 $56 12 - - $714 - $381
3,966
kWh
$56
12
kW-months/year
-
-
MMBtu
$714
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$658
Cost:
$700
$658 6,854 - - - - - - $658
6,854
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$71,196
Cost:
$875,000
$62,331 649,277 $4,207 882 - - $4,658 - $62,331
649,277
kWh
$4,207
882
kW-months/year
-
-
MMBtu
$4,658
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,210
Cost:
$12,000
$1,061 10,609 $149 31 - - - - $1,061
10,609
kWh
$149
31
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$93,474
Cost:
$93,474
$93,474 973,687 - - - - - - $93,474
973,687
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$209,339
Cost:
$1,094,889
$177,731 1,849,778 $7,245 1,519 $3,785 556 $20,578 - $177,731
1,849,778
kWh
$7,245
1,519
kW-months/year
$3,785
556
MMBtu
$20,578
-
$
TOTAL IMPLEMENTED Savings:
$136,933
Cost:
$207,889
$114,339 1,189,892 $2,889 606 $3,785 556 $15,920 - $114,339
1,189,892
kWh
$2,889
606
kW-months/year
$3,785
556
MMBtu
$15,920
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost