IAC logo
IAC Assessment: MZ0247
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0247
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2018
Principal Product Plastic
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 90,000
Annual Production 200,000 Pieces
Production Hrs. Annual 6,240
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $318,332 6,260,060 kWh $0.05
Electricity Demand $304,153 17,823 kW-months/year $17.07
Electricity Fees $15,802 - $ -
TOTAL ENERGY COSTS $638,287
RECOMMENDED SAVINGS* $63,086 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,661
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$29,241
Cost:
$3,340
- - $29,241 1,713 -
-
kWh
$29,241
1,713
kW-months/year
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,764
Cost:
$10,000
- - $13,764 806 -
-
kWh
$13,764
806
kW-months/year
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,231
Cost:
$2,346
$6,231 122,407 - - $6,231
122,407
kWh
-
-
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,430
Cost:
$4,900
$2,672 52,495 $1,758 103 $2,672
52,495
kWh
$1,758
103
kW-months/year
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,573
Cost:
$500
$2,173 42,696 $1,400 82 $2,173
42,696
kWh
$1,400
82
kW-months/year
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,053
Cost:
$170
$1,858 36,796 $1,195 70 $1,858
36,796
kWh
$1,195
70
kW-months/year
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,794
Cost:
$740
$1,702 33,444 $1,092 64 $1,702
33,444
kWh
$1,092
64
kW-months/year
TOTAL RECOMMENDED Savings:
$63,086
Cost:
$21,996
$14,636 287,838 $48,450 2,838 $14,636
287,838
kWh
$48,450
2,838
kW-months/year
TOTAL IMPLEMENTED Savings:
$10,661
Cost:
$7,246
$8,903 174,902 $1,758 103 $8,903
174,902
kWh
$1,758
103
kW-months/year
Savings
Cost
$ kWh $ kW-months/year