IAC logo
IAC Assessment: MZ0273
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0273
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2019
Principal Product Cabinetry
NAICS 337110 - Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434 - Wood Kitchen Cabinets
Sales $10,000,000-$50,000,000
# of Employees 700
Plant Area (Sq.Ft.) 400,000
Annual Production 312,000 Units
Production Hrs. Annual 4,160
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $259,850 5,999,887 kWh $0.04
Electricity Demand $331,110 17,216 kW-months/year $19.23
Electricity Fees $6,596 - $ -
Natural Gas $154,499 35,622 MMBtu $4.34
TOTAL ENERGY COSTS $752,055
RECOMMENDED SAVINGS* $58,190 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,670
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 3.6125 SELL COMBUSTIBLE WASTE Savings:
$16,000
Cost:
$440
- - - - $16,000 4,000,000 - - -
-
kWh
-
-
kW-months/year
$16,000
4,000,000
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,986
Cost:
$1,880
$5,048 123,948 $7,418 358 - - $(-480) - $5,048
123,948
kWh
$7,418
358
kW-months/year
-
-
lb
$(-480)
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,770
Cost:
$3,200
- - $9,770 472 - - - - -
-
kWh
$9,770
472
kW-months/year
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,520
Cost:
$7,260
$3,044 74,746 $4,476 216 - - - - $3,044
74,746
kWh
$4,476
216
kW-months/year
-
-
lb
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,687
Cost:
$1,800
$3,687 90,541 - - - - - - $3,687
90,541
kWh
-
-
kW-months/year
-
-
lb
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,794
Cost:
$630
$1,132 27,803 $1,662 80 - - - - $1,132
27,803
kWh
$1,662
80
kW-months/year
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,776
Cost:
$3,070
$1,125 27,622 $1,651 80 - - - - $1,125
27,622
kWh
$1,651
80
kW-months/year
-
-
lb
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,304
Cost:
$390
$936 22,981 $1,368 66 - - - - $936
22,981
kWh
$1,368
66
kW-months/year
-
-
lb
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,353
Cost:
$80
$548 13,463 $805 39 - - - - $548
13,463
kWh
$805
39
kW-months/year
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$58,190
Cost:
$18,750
$15,520 381,104 $27,150 1,311 $16,000 4,000,000 $(-480) - $15,520
381,104
kWh
$27,150
1,311
kW-months/year
$16,000
4,000,000
lb
$(-480)
-
$
TOTAL IMPLEMENTED Savings:
$34,670
Cost:
$11,050
$12,476 306,358 $22,674 1,095 - - $(-480) - $12,476
306,358
kWh
$22,674
1,095
kW-months/year
-
-
lb
$(-480)
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes