Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2019 |
Principal Product | Cabinetry |
NAICS | 337110 - Wood Kitchen Cabinet and Countertop Manufacturing |
SIC | 2434 - Wood Kitchen Cabinets |
Sales | $10,000,000-$50,000,000 |
# of Employees | 700 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 312,000 Units |
Production Hrs. Annual | 4,160 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $259,850 | 5,999,887 | kWh | $0.04 |
Electricity Demand | $331,110 | 17,216 | kW-months/year | $19.23 |
Electricity Fees | $6,596 | - | $ | - |
Natural Gas | $154,499 | 35,622 | MMBtu | $4.34 |
TOTAL ENERGY COSTS | $752,055 | |||
RECOMMENDED SAVINGS* | $58,190 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,670 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6125 SELL COMBUSTIBLE WASTE |
Savings: $16,000 Cost: $440 |
- | - | - | - | $16,000 | 4,000,000 | - | - |
- - kWh |
- - kW-months/year |
$16,000 4,000,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $11,986 Cost: $1,880 |
$5,048 | 123,948 | $7,418 | 358 | - | - | $(-480) | - |
$5,048 123,948 kWh |
$7,418 358 kW-months/year |
- - lb |
$(-480) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $9,770 Cost: $3,200 |
- | - | $9,770 | 472 | - | - | - | - |
- - kWh |
$9,770 472 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,520 Cost: $7,260 |
$3,044 | 74,746 | $4,476 | 216 | - | - | - | - |
$3,044 74,746 kWh |
$4,476 216 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $3,687 Cost: $1,800 |
$3,687 | 90,541 | - | - | - | - | - | - |
$3,687 90,541 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,794 Cost: $630 |
$1,132 | 27,803 | $1,662 | 80 | - | - | - | - |
$1,132 27,803 kWh |
$1,662 80 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,776 Cost: $3,070 |
$1,125 | 27,622 | $1,651 | 80 | - | - | - | - |
$1,125 27,622 kWh |
$1,651 80 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,304 Cost: $390 |
$936 | 22,981 | $1,368 | 66 | - | - | - | - |
$936 22,981 kWh |
$1,368 66 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,353 Cost: $80 |
$548 | 13,463 | $805 | 39 | - | - | - | - |
$548 13,463 kWh |
$805 39 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $58,190 Cost: $18,750 |
$15,520 | 381,104 | $27,150 | 1,311 | $16,000 | 4,000,000 | $(-480) | - | $15,520 381,104 kWh |
$27,150 1,311 kW-months/year |
$16,000 4,000,000 lb |
$(-480) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,670 Cost: $11,050 |
$12,476 | 306,358 | $22,674 | 1,095 | - | - | $(-480) | - | $12,476 306,358 kWh |
$22,674 1,095 kW-months/year |
- - lb |
$(-480) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes |