IAC logo
IAC Assessment: MZ0274
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0274
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2019
Principal Product School/Commercial Bus
NAICS 336211 - Motor Vehicle Body Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 270,000
Annual Production 2,500 Units
Production Hrs. Annual 2,080
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,147 2,649,719 kWh $0.05
Electricity Demand $207,937 10,086 kW-months/year $20.62
Electricity Fees $3,122 - $ -
Natural Gas $87,373 17,604 MMBtu $4.96
TOTAL ENERGY COSTS $428,579
RECOMMENDED SAVINGS* $85,923 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $64,500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$48,654
Cost:
$104,076
$12,431 298,114 $36,223 1,720 - - $12,431
298,114
kWh
$36,223
1,720
kW-months/year
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$11,093
Cost:
$7,580
$2,795 67,037 $8,298 394 - - $2,795
67,037
kWh
$8,298
394
kW-months/year
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,193
Cost:
$4,500
$2,348 56,302 $6,845 325 - - $2,348
56,302
kWh
$6,845
325
kW-months/year
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,887
Cost:
$3,200
- - $8,887 422 - - -
-
kWh
$8,887
422
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,363
Cost:
$2,480
$1,730 41,492 $5,033 239 $(-2,400) - $1,730
41,492
kWh
$5,033
239
kW-months/year
$(-2,400)
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,585
Cost:
$3,900
$1,585 38,017 - - - - $1,585
38,017
kWh
-
-
kW-months/year
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$763
Cost:
$400
$194 4,660 $569 27 - - $194
4,660
kWh
$569
27
kW-months/year
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$705
Cost:
$1,100
$178 4,262 $527 25 - - $178
4,262
kWh
$527
25
kW-months/year
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$680
Cost:
$100
$175 4,191 $505 24 - - $175
4,191
kWh
$505
24
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$85,923
Cost:
$127,336
$21,436 514,075 $66,887 3,176 $(-2,400) - $21,436
514,075
kWh
$66,887
3,176
kW-months/year
$(-2,400)
-
$
TOTAL IMPLEMENTED Savings:
$64,500
Cost:
$116,056
$18,272 438,187 $48,628 2,309 $(-2,400) - $18,272
438,187
kWh
$48,628
2,309
kW-months/year
$(-2,400)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes