Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2019 |
Principal Product | School/Commercial Bus |
NAICS | 336211 - Motor Vehicle Body Manufacturing |
SIC | 3711 - Motor Vehicles And Car Bodies |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 270,000 |
Annual Production | 2,500 Units |
Production Hrs. Annual | 2,080 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $130,147 | 2,649,719 | kWh | $0.05 |
Electricity Demand | $207,937 | 10,086 | kW-months/year | $20.62 |
Electricity Fees | $3,122 | - | $ | - |
Natural Gas | $87,373 | 17,604 | MMBtu | $4.96 |
TOTAL ENERGY COSTS | $428,579 | |||
RECOMMENDED SAVINGS* | $85,923 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $64,500 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $48,654 Cost: $104,076 |
$12,431 | 298,114 | $36,223 | 1,720 | - | - |
$12,431 298,114 kWh |
$36,223 1,720 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $11,093 Cost: $7,580 |
$2,795 | 67,037 | $8,298 | 394 | - | - |
$2,795 67,037 kWh |
$8,298 394 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $9,193 Cost: $4,500 |
$2,348 | 56,302 | $6,845 | 325 | - | - |
$2,348 56,302 kWh |
$6,845 325 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $8,887 Cost: $3,200 |
- | - | $8,887 | 422 | - | - |
- - kWh |
$8,887 422 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,363 Cost: $2,480 |
$1,730 | 41,492 | $5,033 | 239 | $(-2,400) | - |
$1,730 41,492 kWh |
$5,033 239 kW-months/year |
$(-2,400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,585 Cost: $3,900 |
$1,585 | 38,017 | - | - | - | - |
$1,585 38,017 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $763 Cost: $400 |
$194 | 4,660 | $569 | 27 | - | - |
$194 4,660 kWh |
$569 27 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $705 Cost: $1,100 |
$178 | 4,262 | $527 | 25 | - | - |
$178 4,262 kWh |
$527 25 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $680 Cost: $100 |
$175 | 4,191 | $505 | 24 | - | - |
$175 4,191 kWh |
$505 24 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $85,923 Cost: $127,336 |
$21,436 | 514,075 | $66,887 | 3,176 | $(-2,400) | - | $21,436 514,075 kWh |
$66,887 3,176 kW-months/year |
$(-2,400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $64,500 Cost: $116,056 |
$18,272 | 438,187 | $48,628 | 2,309 | $(-2,400) | - | $18,272 438,187 kWh |
$48,628 2,309 kW-months/year |
$(-2,400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes |