IAC Assessment: MZ0278
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0278
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2019
Principal Product Cups, Lids, and Food Packaging
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 750
Plant Area (Sq.Ft.) 440,000
Annual Production 120,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $5,660,085 141,237,583 kWh $0.04
Electricity Demand $4,850,848 234,654 kW-months/year $20.67
Electricity Fees $(-408,570) - $ -
Natural Gas $73,735 21,745 MMBtu $3.39
TOTAL ENERGY COSTS $10,176,098
RECOMMENDED SAVINGS* $1,775,396 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,685,945
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$902,475
Cost:
$6,762,500
$528,968 13,191,219 $373,507 18,070 - - - - $528,968
13,191,219
kWh
$373,507
18,070
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$382,507
Cost:
$601,250
$224,196 5,590,911 $158,311 7,659 - - - - $224,196
5,590,911
kWh
$158,311
7,659
kW-months/year
-
-
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$176,232
Cost:
$3,250
- - $176,232 8,526 - - - - -
-
kWh
$176,232
8,526
kW-months/year
-
-
MMBtu
-
-
$
04: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$126,263
Cost:
$207,500
$43,527 1,085,493 $30,736 1,487 - - $52,000 - $43,527
1,085,493
kWh
$30,736
1,487
kW-months/year
-
-
MMBtu
$52,000
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$53,880
Cost:
$7,750
$31,580 787,534 $22,300 1,079 - - - - $31,580
787,534
kWh
$22,300
1,079
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$45,917
Cost:
$2,907
$45,917 1,145,044 - - - - - - $45,917
1,145,044
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$42,284
Cost:
$13,051
$24,784 618,111 $17,500 846 - - - - $24,784
618,111
kWh
$17,500
846
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$35,571
Cost:
$11,900
- - - - $35,571 10,493 - - -
-
kWh
-
-
kW-months/year
$35,571
10,493
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,558
Cost:
$870
$3,258 81,225 $2,300 111 - - - - $3,258
81,225
kWh
$2,300
111
kW-months/year
-
-
MMBtu
-
-
$
10: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,709
Cost:
$200
$2,766 68,980 $1,943 94 - - - - $2,766
68,980
kWh
$1,943
94
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,775,396
Cost:
$7,611,178
$904,996 22,568,517 $782,829 37,872 $35,571 10,493 $52,000 - $904,996
22,568,517
kWh
$782,829
37,872
kW-months/year
$35,571
10,493
MMBtu
$52,000
-
$
TOTAL IMPLEMENTED Savings:
$1,685,945
Cost:
$7,591,528
$873,416 21,780,983 $760,529 36,793 - - $52,000 - $873,416
21,780,983
kWh
$760,529
36,793
kW-months/year
-
-
MMBtu
$52,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material