IAC logo
IAC Assessment: MZ0280
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0280
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2019
Principal Product Plastic Injection/Blow Molding Parts
NAICS 326121 - Unlaminated Plastics Profile Shape Manufacturing
SIC 3082 - Unsupported Plastics Profile Shapes
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 200,000
Annual Production 10,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,091,051 17,200,800 kWh $0.06
Electricity Demand $96,085 33,682 kW-months/year $2.85
Electricity Fees $29,535 - $ -
TOTAL ENERGY COSTS $1,216,671
RECOMMENDED SAVINGS* $127,357 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$24,867
Cost:
$24,520
$19,785 312,067 $5,082 1,783 - - - - $19,785
312,067
kWh
$5,082
1,783
kW-months/year
-
-
$
-
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$23,499
Cost:
$2,058
$23,499 370,645 - - - - - - $23,499
370,645
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,503
Cost:
$24,934
$16,634 262,356 $1,869 656 - - - - $16,634
262,356
kWh
$1,869
656
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,792
Cost:
$2,148
$16,011 252,536 $1,029 361 - - $(-1,248) - $16,011
252,536
kWh
$1,029
361
kW-months/year
-
-
$
$(-1,248)
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$14,313
Cost:
$9,858
$13,449 212,132 $864 304 - - - - $13,449
212,132
kWh
$864
304
kW-months/year
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,016
Cost:
$3,196
$8,472 133,630 $544 191 - - - - $8,472
133,630
kWh
$544
191
kW-months/year
-
-
$
-
-
$
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$5,205
Cost:
-
- - - - $5,205 - - - -
-
kWh
-
-
kW-months/year
$5,205
-
$
-
-
$
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,754
Cost:
$3,520
- - $4,754 1,688 - - - - -
-
kWh
$4,754
1,688
kW-months/year
-
-
$
-
-
$
09: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$4,436
Cost:
$8,160
$3,787 59,724 $649 228 - - - - $3,787
59,724
kWh
$649
228
kW-months/year
-
-
$
-
-
$
10: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$3,747
Cost:
$6,080
$2,980 46,998 $767 269 - - - - $2,980
46,998
kWh
$767
269
kW-months/year
-
-
$
-
-
$
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,072
Cost:
$1,664
$1,947 30,712 $125 44 - - - - $1,947
30,712
kWh
$125
44
kW-months/year
-
-
$
-
-
$
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,153
Cost:
$550
$1,085 17,113 $68 24 - - - - $1,085
17,113
kWh
$68
24
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$127,357
Cost:
$86,688
$107,649 1,697,913 $15,751 5,548 $5,205 - $(-1,248) - $107,649
1,697,913
kWh
$15,751
5,548
kW-months/year
$5,205
-
$
$(-1,248)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $