Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2020 |
Principal Product | Doors, HVAC Towers, Pots, and Pans |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 7,000,000 Pounds |
Production Hrs. Annual | 7,000 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $366,336 | 4,164,960 | kWh | $0.09 |
Electricity Demand | $1 | 14,465 | kW-months/year | $0.00 |
Electricity Fees | $1,292 | - | $ | - |
Natural Gas | $31,001 | 9,538 | MMBtu | $3.25 |
TOTAL ENERGY COSTS | $398,630 | |||
RECOMMENDED SAVINGS* | $37,881 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,664 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $10,540 Cost: $2,484 |
$10,540 | 119,776 | - | - | - | - | - | - |
$10,540 119,776 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,461 Cost: $1,310 |
$8,901 | 101,150 | - | - | - | - | $(-440) | - |
$8,901 101,150 kWh |
- - $ |
- - MMBtu |
$(-440) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,049 Cost: $14,550 |
$6,049 | 68,734 | - | - | - | - | - | - |
$6,049 68,734 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $4,983 Cost: $6,696 |
- | - | - | - | $4,983 | 1,533 | - | - |
- - kWh |
- - $ |
$4,983 1,533 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,939 Cost: $356 |
- | - | - | - | $2,939 | 904 | - | - |
- - kWh |
- - $ |
$2,939 904 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,755 Cost: $5,978 |
$2,755 | 31,304 | - | - | - | - | - | - |
$2,755 31,304 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $937 Cost: $4,000 |
- | - | $937 | - | - | - | - | - |
- - kWh |
$937 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $638 Cost: $1,220 |
- | - | $638 | - | - | - | - | - |
- - kWh |
$638 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $579 Cost: $847 |
$579 | 6,580 | - | - | - | - | - | - |
$579 6,580 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,881 Cost: $37,441 |
$28,824 | 327,544 | $1,575 | - | $7,922 | 2,437 | $(-440) | - | $28,824 327,544 kWh |
$1,575 - $ |
$7,922 2,437 MMBtu |
$(-440) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,664 Cost: $35,374 |
$28,245 | 320,964 | $937 | - | $7,922 | 2,437 | $(-440) | - | $28,245 320,964 kWh |
$937 - $ |
$7,922 2,437 MMBtu |
$(-440) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes |