IAC Assessment: MZ0288
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0288
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2020
Principal Product Aircraft Components
NAICS 334514 - Totalizing Fluid Meter and Counting Device Manufacturing
SIC 3824 - Fluid Meters And Counting Devices
Sales $50,000,000-$100,000,000
# of Employees 111
Plant Area (Sq.Ft.) 76,000
Annual Production 20,000 Units
Production Hrs. Annual 2,400
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,202 2,158,275 kWh $0.05
Electricity Demand $110,709 6,280 kW-months/year $17.63
Electricity Fees $2,031 - $ -
TOTAL ENERGY COSTS $230,942
RECOMMENDED SAVINGS* $25,307 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,689
Cost:
$41,089
$7,440 114,550 $8,249 516 - - $7,440
114,550
kWh
$8,249
516
kW-months/year
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,118
Cost:
$3,400
- - $6,118 269 - - -
-
kWh
$6,118
269
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,574
Cost:
$1,660
$602 15,510 $1,772 78 $(-800) - $602
15,510
kWh
$1,772
78
kW-months/year
$(-800)
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,502
Cost:
$3,320
$383 9,858 $1,119 49 - - $383
9,858
kWh
$1,119
49
kW-months/year
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$424
Cost:
$430
$106 2,738 $318 14 - - $106
2,738
kWh
$318
14
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$25,307
Cost:
$49,899
$8,531 142,656 $17,576 926 $(-800) - $8,531
142,656
kWh
$17,576
926
kW-months/year
$(-800)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes