IAC Assessment: MZ0329
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0329
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2022
Principal Product hand held surgical instruments
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 60,000
Annual Production 111,000 Pieces
Production Hrs. Annual 2,375
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,177 1,124,400 kWh $0.09
Electricity Demand $15,567 4,751 kW-months/year $3.28
Natural Gas $9,768 1,312 MMBtu $7.45
TOTAL ENERGY COSTS $122,512
RECOMMENDED SAVINGS* $23,341 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,095
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$382
Cost:
$240
$325 3,783 $56 17 - - $325
3,783
kWh
$56
17
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,529
Cost:
$20,439
$3,157 36,707 $869 265 $3,503 - $3,157
36,707
kWh
$869
265
kW-months/year
$3,503
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$540
Cost:
$3,202
$453 5,262 $87 27 - - $453
5,262
kWh
$87
27
kW-months/year
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$11,471
Cost:
$60,924
$9,418 109,515 $2,053 626 - - $9,418
109,515
kWh
$2,053
626
kW-months/year
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$583
Cost:
$960
$583 6,770 - - - - $583
6,770
kWh
-
-
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$983
Cost:
$150
$805 9,365 $178 54 - - $805
9,365
kWh
$178
54
kW-months/year
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,853
Cost:
$4,331
$1,853 21,541 - - - - $1,853
21,541
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$23,341
Cost:
$90,246
$16,594 192,943 $3,243 988 $3,503 - $16,594
192,943
kWh
$3,243
988
kW-months/year
$3,503
-
$
TOTAL IMPLEMENTED Savings:
$9,095
Cost:
$21,549
$4,545 52,842 $1,047 319 $3,503 - $4,545
52,842
kWh
$1,047
319
kW-months/year
$3,503
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost