IAC logo
IAC Assessment: MZ0333
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0333
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2022
Principal Product Beef, Pork, Grind, and Chicken
NAICS 311611 - Animal (except Poultry) Slaughtering
SIC 2011 - Meat Packing Plants
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 150,000
Annual Production 105,000,000 Units
Production Hrs. Annual 4,160
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $661,232 11,281,200 kWh $0.06
Electricity Demand $385,224 25,116 kW-months/year $15.34
Electricity Fees $9,602 - $ -
Natural Gas $76,347 10,145 MMBtu $7.53
TOTAL ENERGY COSTS $1,132,405
RECOMMENDED SAVINGS* $27,406 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$14,542
Cost:
$3,330
- - $14,542 948 - - -
-
kWh
$14,542
948
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,379
Cost:
$21,815
$5,229 89,235 $3,150 205 - - $5,229
89,235
kWh
$3,150
205
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,733
Cost:
$1,330
- - - - $2,733 363 -
-
kWh
-
-
kW-months/year
$2,733
363
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,752
Cost:
$66
$998 17,031 $754 49 - - $998
17,031
kWh
$754
49
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,406
Cost:
$26,541
$6,227 106,266 $18,446 1,202 $2,733 363 $6,227
106,266
kWh
$18,446
1,202
kW-months/year
$2,733
363
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas