IAC logo
IAC Assessment: NC0027
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0027
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1994
Principal Product Speed Reducers
NAICS n/a
SIC 3556 - Food Products Machinery
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 85,000
Annual Production 130,000 Pieces
Production Hrs. Annual 6,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,315 2,536,929 kWh $0.06
Natural Gas $50,662 6,781 MMBtu $7.47
TOTAL ENERGY COSTS $191,977
RECOMMENDED SAVINGS* $11,387 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,985
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,154
Cost:
$412
$1,154 20,223 - - $1,154
20,223
kWh
-
-
MMBtu
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,555
Cost:
-
$1,555 27,257 - - $1,555
27,257
kWh
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,007
Cost:
$240
$1,007 17,585 - - $1,007
17,585
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,702
Cost:
$390
$1,702 29,894 - - $1,702
29,894
kWh
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$419
Cost:
$250
$419 7,327 - - $419
7,327
kWh
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,686
Cost:
$5,000
- - $1,686 226 -
-
kWh
$1,686
226
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,864
Cost:
$500
$3,864 67,702 - - $3,864
67,702
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$11,387
Cost:
$6,792
$9,701 169,988 $1,686 226 $9,701
169,988
kWh
$1,686
226
MMBtu
TOTAL IMPLEMENTED Savings:
$5,985
Cost:
$1,140
$5,985 104,923 - - $5,985
104,923
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas