IAC logo
IAC Assessment: NC0040
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0040
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1994
Principal Product Conveyors & Motorized Pulleys
NAICS n/a
SIC 3562 - Ball And Roller Bearings
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 245,000
Annual Production 0 Units
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $186,817 3,345,252 kWh $0.06
LPG $12,989 2,072 MMBtu $6.27
TOTAL ENERGY COSTS $199,806
RECOMMENDED SAVINGS* $16,867 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,189
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$659
Cost:
$480
$659 11,723 - - $659
11,723
kWh
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,912
Cost:
$1,600
$1,912 34,291 - - $1,912
34,291
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$723
Cost:
$360
$723 12,896 - - $723
12,896
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,044
Cost:
$3,000
- - $2,044 326 -
-
kWh
$2,044
326
MMBtu
05: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$10,722
Cost:
-
$10,722 192,556 - - $10,722
192,556
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$807
Cost:
$1,190
$807 14,361 - - $807
14,361
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$16,867
Cost:
$6,630
$14,823 265,827 $2,044 326 $14,823
265,827
kWh
$2,044
326
MMBtu
TOTAL IMPLEMENTED Savings:
$2,189
Cost:
$2,030
$2,189 38,980 - - $2,189
38,980
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas