Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1994 |
Principal Product | Nitrogen Fertilizer Solutions |
NAICS | n/a |
SIC | 2873 - Nitrogenous Fertilizers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 74 |
Plant Area (Sq.Ft.) | 2,500,000 |
Annual Production | 203,000 Tons |
Production Hrs. Annual | 8,400 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,139,182 | 20,156,214 | kWh | $0.06 |
Natural Gas | $616,294 | 140,753 | MMBtu | $4.38 |
Other Energy | $402,211 | 168,584 | MMBtu | $2.39 |
TOTAL ENERGY COSTS | $2,157,687 | |||
RECOMMENDED SAVINGS* | $109,127 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,742 |
#|Description |
Savings Cost |
Status | Electricity Usage | Other Energy | Electricity Usage | Other Energy | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $51,000 Cost: $30,000 |
- | - | $51,000 | 14,698 |
- - kWh |
$51,000 14,698 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $32,164 Cost: $45,000 |
$32,164 | 643,611 | - | - |
$32,164 643,611 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $19,742 Cost: $13,480 |
$19,742 | 252,345 | - | - |
$19,742 252,345 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $3,593 Cost: $5,000 |
$3,593 | 71,805 | - | - |
$3,593 71,805 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $2,628 Cost: $840 |
$2,628 | 52,462 | - | - |
$2,628 52,462 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $109,127 Cost: $94,320 |
$58,127 | 1,020,223 | $51,000 | 14,698 | $58,127 1,020,223 kWh |
$51,000 14,698 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,742 Cost: $13,480 |
$19,742 | 252,345 | - | - | $19,742 252,345 kWh |