IAC logo
IAC Assessment: NC0078
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0078
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1996
Principal Product Magnet Wire
NAICS n/a
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 179,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $508,946 20,041,618 kWh $0.03
Electricity Demand $515,305 31,087 kW-months/year $16.58
Electricity Fees $23,870 - $ -
Natural Gas $112,200 29,243 MMBtu $3.84
TOTAL ENERGY COSTS $1,167,455
RECOMMENDED SAVINGS* $40,041 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,379
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,648
Cost:
$6,993
$1,361 53,048 $1,287 80 - - - - $1,361
53,048
kWh
$1,287
80
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,528
Cost:
$1,530
$333 12,896 $284 18 - - $911 - $333
12,896
kWh
$284
18
kW-months/year
-
-
lb
$911
-
$
03: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$14,370
Cost:
$7,500
$14,370 560,082 - - - - - - $14,370
560,082
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$5,344
Cost:
-
$1,499 58,324 $3,845 240 - - - - $1,499
58,324
kWh
$3,845
240
kW-months/year
-
-
lb
-
-
$
05: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$9,017
Cost:
$20,000
$3,833 162,075 $5,184 324 - - - - $3,833
162,075
kWh
$5,184
324
kW-months/year
-
-
lb
-
-
$
06: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$7,134
Cost:
$25,000
- - - - $7,134 4,000 - - -
-
kWh
-
-
kW-months/year
$7,134
4,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$40,041
Cost:
$61,023
$21,396 846,425 $10,600 662 $7,134 4,000 $911 - $21,396
846,425
kWh
$10,600
662
kW-months/year
$7,134
4,000
lb
$911
-
$
TOTAL IMPLEMENTED Savings:
$31,379
Cost:
$34,493
$21,063 833,529 $10,316 644 - - - - $21,063
833,529
kWh
$10,316
644
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes