IAC Assessment: NC0079
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0079
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1996
Principal Product Textile finishing products
NAICS n/a
SIC 2816 - Inorganic Pigments
Sales $10,000,000-$50,000,000
# of Employees 185
Plant Area (Sq.Ft.) 360,000
Annual Production 29,800,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $237,584 8,143,318 kWh $0.03
Electricity Demand $149,251 15,602 kW-months/year $9.57
Natural Gas $141,452 48,175 MMBtu $2.94
TOTAL ENERGY COSTS $531,138
RECOMMENDED SAVINGS* $23,286 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $970
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$190
Cost:
$600
$190 6,741 - - - - - - $190
6,741
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$970
Cost:
$60
$579 20,809 $391 42 - - - - $579
20,809
kWh
$391
42
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,578
Cost:
$1,200
- - - - $1,578 544 - - -
-
kWh
-
-
kW-months/year
$1,578
544
MMBtu
-
-
lb
04: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$1,117
Cost:
$3,000
$1,117 40,152 - - - - - - $1,117
40,152
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,234
Cost:
$6,000
$1,001 36,049 $678 72 $(-445) (-154) - - $1,001
36,049
kWh
$678
72
kW-months/year
$(-445)
(-154)
MMBtu
-
-
lb
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$13,641
Cost:
$6,000
$13,641 490,914 - - - - - - $13,641
490,914
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,705
Cost:
$2,500
$1,705 80,012 - - - - - - $1,705
80,012
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,851
Cost:
$200
- - - - - - $2,851 142,600 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,851
142,600
lb
TOTAL RECOMMENDED Savings:
$23,286
Cost:
$19,560
$18,233 674,677 $1,069 114 $1,133 390 $2,851 142,600 $18,233
674,677
kWh
$1,069
114
kW-months/year
$1,133
390
MMBtu
$2,851
142,600
lb
TOTAL IMPLEMENTED Savings:
$970
Cost:
$60
$579 20,809 $391 42 - - - - $579
20,809
kWh
$391
42
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)