Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1996 |
Principal Product | Custom built air handlers |
NAICS | n/a |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 178,000 |
Annual Production | 400 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $58,673 | 1,783,998 | kWh | $0.03 |
Electricity Demand | $54,454 | 6,508 | kW-months/year | $8.37 |
Natural Gas | $18,681 | 4,324 | MMBtu | $4.32 |
TOTAL ENERGY COSTS | $136,708 | |||
RECOMMENDED SAVINGS* | $8,039 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,073 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $93 Cost: $180 |
$31 | 879 | $62 | 7 | - | - | - | - | - | - |
$31 879 kWh |
$62 7 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $302 Cost: $100 |
$31 | 879 | $271 | 32 | - | - | - | - | - | - |
$31 879 kWh |
$271 32 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $414 Cost: $600 |
- | - | - | - | $414 | 96 | - | - | - | - |
- - kWh |
- - kW-months/year |
$414 96 MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $246 Cost: $600 |
- | - | - | - | $246 | 57 | - | - | - | - |
- - kWh |
- - kW-months/year |
$246 57 MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,518 Cost: $9,807 |
$606 | 18,171 | $912 | 109 | - | - | - | - | - | - |
$606 18,171 kWh |
$912 109 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $566 Cost: $1,600 |
$1,094 | 40,152 | $224 | 30 | $(-752) | (-174) | - | - | - | - |
$1,094 40,152 kWh |
$224 30 kW-months/year |
$(-752) (-174) MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $4,700 Cost: $1,800 |
- | - | - | - | - | - | $4,700 | 150 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,700 150 gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $200 Cost: $100 |
- | - | - | - | - | - | - | - | $200 | 15,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$200 15,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $8,039 Cost: $14,787 |
$1,762 | 60,081 | $1,469 | 178 | $(-92) | (-21) | $4,700 | 150 | $200 | 15,000 | $1,762 60,081 kWh |
$1,469 178 kW-months/year |
$(-92) (-21) MMBtu |
$4,700 150 gal |
$200 15,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,073 Cost: $2,380 |
$1,125 | 41,031 | $286 | 37 | $(-338) | (-78) | - | - | - | - | $1,125 41,031 kWh |
$286 37 kW-months/year |
$(-338) (-78) MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||