IAC logo
IAC Assessment: NC0080
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0080
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1996
Principal Product Custom built air handlers
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 178,000
Annual Production 400 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,673 1,783,998 kWh $0.03
Electricity Demand $54,454 6,508 kW-months/year $8.37
Natural Gas $18,681 4,324 MMBtu $4.32
TOTAL ENERGY COSTS $136,708
RECOMMENDED SAVINGS* $8,039 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,073
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$93
Cost:
$180
$31 879 $62 7 - - - - - - $31
879
kWh
$62
7
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$302
Cost:
$100
$31 879 $271 32 - - - - - - $31
879
kWh
$271
32
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$414
Cost:
$600
- - - - $414 96 - - - - -
-
kWh
-
-
kW-months/year
$414
96
MMBtu
-
-
gal
-
-
lb
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$246
Cost:
$600
- - - - $246 57 - - - - -
-
kWh
-
-
kW-months/year
$246
57
MMBtu
-
-
gal
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,518
Cost:
$9,807
$606 18,171 $912 109 - - - - - - $606
18,171
kWh
$912
109
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$566
Cost:
$1,600
$1,094 40,152 $224 30 $(-752) (-174) - - - - $1,094
40,152
kWh
$224
30
kW-months/year
$(-752)
(-174)
MMBtu
-
-
gal
-
-
lb
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$4,700
Cost:
$1,800
- - - - - - $4,700 150 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,700
150
gal
-
-
lb
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$200
Cost:
$100
- - - - - - - - $200 15,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$200
15,000
lb
TOTAL RECOMMENDED Savings:
$8,039
Cost:
$14,787
$1,762 60,081 $1,469 178 $(-92) (-21) $4,700 150 $200 15,000 $1,762
60,081
kWh
$1,469
178
kW-months/year
$(-92)
(-21)
MMBtu
$4,700
150
gal
$200
15,000
lb
TOTAL IMPLEMENTED Savings:
$1,073
Cost:
$2,380
$1,125 41,031 $286 37 $(-338) (-78) - - - - $1,125
41,031
kWh
$286
37
kW-months/year
$(-338)
(-78)
MMBtu
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz)