IAC logo
IAC Assessment: NC0085
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0085
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1996
Principal Product Coatings
NAICS n/a
SIC 2851 - Paints And Allied Products
Sales $50,000,000-$100,000,000
# of Employees 115
Plant Area (Sq.Ft.) 60,000
Annual Production 2,600 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $188,975 4,755,276 kWh $0.04
Electricity Demand $73,897 10,235 kW-months/year $7.22
Electricity Fees $19,567 - $ -
Natural Gas $56,569 11,792 MMBtu $4.80
TOTAL ENERGY COSTS $340,039
RECOMMENDED SAVINGS* $18,681 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,085
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$144
Cost:
-
$144 3,517 - - - - - - - - - - $144
3,517
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$14,587
Cost:
$25,400
- - - - $14,587 3,039 - - - - - - -
-
kWh
-
-
kW-months/year
$14,587
3,039
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$738
Cost:
$600
- - - - $738 154 - - - - - - -
-
kWh
-
-
kW-months/year
$738
154
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$594
Cost:
-
- - - - - - $594 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$594
-
Tgal
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$910
Cost:
$520
$289 7,327 $72 10 - - - - - - $549 - $289
7,327
kWh
$72
10
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$549
-
$
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,271
Cost:
-
$637 16,120 $634 88 - - - - - - - - $637
16,120
kWh
$634
88
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$437
Cost:
-
- - - - - - - - $437 39,700 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$437
39,700
lb
-
-
$
TOTAL RECOMMENDED Savings:
$18,681
Cost:
$26,520
$1,070 26,964 $706 98 $15,325 3,193 $594 - $437 39,700 $549 - $1,070
26,964
kWh
$706
98
kW-months/year
$15,325
3,193
MMBtu
$594
-
Tgal
$437
39,700
lb
$549
-
$
TOTAL IMPLEMENTED Savings:
$2,085
Cost:
$1,120
$289 7,327 $72 10 $738 154 - - $437 39,700 $549 - $289
7,327
kWh
$72
10
kW-months/year
$738
154
MMBtu
-
-
Tgal
$437
39,700
lb
$549
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Ancillary Material Cost