IAC logo
IAC Assessment: NC0102
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0102
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1996
Principal Product Meat products
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $50,000,000-$100,000,000
# of Employees 618
Plant Area (Sq.Ft.) 150,000
Annual Production 60,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $786,222 24,859,320 kWh $0.03
Electricity Demand $421,598 33,258 kW-months/year $12.68
Natural Gas $171,247 57,063 MMBtu $3.00
TOTAL ENERGY COSTS $1,470,306
RECOMMENDED SAVINGS* $62,800 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,103
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,712
Cost:
$4,725
$3,786 119,871 $2,926 246 - - - - - - - - - - $3,786
119,871
kWh
$2,926
246
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$764
Cost:
$2,500
$685 21,688 $79 7 - - - - - - - - - - $685
21,688
kWh
$79
7
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
03: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$8,399
Cost:
$2,500
$5,032 159,144 $3,367 283 - - - - - - - - - - $5,032
159,144
kWh
$3,367
283
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,100
Cost:
$700
- - - - $5,100 1,700 - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,100
1,700
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,369
Cost:
$30
$1,352 42,790 $1,017 86 - - - - - - - - - - $1,352
42,790
kWh
$1,017
86
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$3,239
Cost:
$5,000
- - - - - - - - $3,739 70,000 $(-500) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$3,739
70,000
lb
$(-500)
-
$
-
-
$
07: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$36,217
Cost:
$30,000
$(-1,192) (-37,808) $(-1,341) (-113) - - $43,750 5,212,500 - - - - $(-5,000) - $(-1,192)
(-37,808)
kWh
$(-1,341)
(-113)
kW-months/year
-
-
MMBtu
$43,750
5,212,500
Tgal
-
-
lb
-
-
$
$(-5,000)
-
$
TOTAL RECOMMENDED Savings:
$62,800
Cost:
$45,455
$9,663 305,685 $6,048 509 $5,100 1,700 $43,750 5,212,500 $3,739 70,000 $(-500) - $(-5,000) - $9,663
305,685
kWh
$6,048
509
kW-months/year
$5,100
1,700
MMBtu
$43,750
5,212,500
Tgal
$3,739
70,000
lb
$(-500)
-
$
$(-5,000)
-
$
TOTAL IMPLEMENTED Savings:
$9,103
Cost:
$8,200
$685 21,688 $79 7 $5,100 1,700 - - $3,739 70,000 $(-500) - - - $685
21,688
kWh
$79
7
kW-months/year
$5,100
1,700
MMBtu
-
-
Tgal
$3,739
70,000
lb
$(-500)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost