Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1997
Principal Product Casters
NAICS n/a
SIC 3429 - Hardware, Nec
Sales $10,000,000-$50,000,000
# of Employees 147
Plant Area (Sq.Ft.) 120,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,386 1,530,481 kWh $0.05
Electricity Demand $16,938 4,469 kW-months/year $3.79
Electricity Fees $2,899 - $ -
Natural Gas $28,507 4,783 MMBtu $5.96
TOTAL ENERGY COSTS $131,332
RECOMMENDED SAVINGS* $118,656 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,386
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product By-product Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb $ $ $ $ $ $ $ $ $ $ $ $
01: 2.2514 COVER OPEN TANKS Savings:
$359
Cost:
$195
$359 7,913 - - - - - - - - - - - - - - - - - - - - - - $359
7,913
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,857
Cost:
$2,925
$3,312 74,736 $1,637 432 $(-2,092) (-351) - - - - - - - - - - - - - - - - - - $3,312
74,736
kWh
$1,637
432
kW-months/year
$(-2,092)
(-351)
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,248
Cost:
$510
$835 18,171 $413 109 - - - - - - - - - - - - - - - - - - - - $835
18,171
kWh
$413
109
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$179
Cost:
$400
$46 879 $133 35 - - - - - - - - - - - - - - - - - - - - $46
879
kWh
$133
35
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$110
Cost:
$56
$74 1,465 $36 10 - - - - - - - - - - - - - - - - - - - - $74
1,465
kWh
$36
10
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$9,198
Cost:
$12,000
- - - - $(-148) (-25) - - $9,346 1,490 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$(-148)
(-25)
MMBtu
-
-
Tgal
$9,346
1,490
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
07: 3.1244 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS Savings:
$605
Cost:
$250
- - - - - - $498 120,000 - - - - - - - - - - $107 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$498
120,000
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
$107
-
$
-
-
$
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,459
Cost:
$5,200
- - - - - - - - - - $2,068 142,600 - - $(-322) - - - - - - - $713 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$2,068
142,600
lb
-
-
$
$(-322)
-
$
-
-
$
-
-
$
-
-
$
$713
-
$
09: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$3,150
Cost:
$1,096
- - - - - - - - - - - - $3,150 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$3,150
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
10: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$4,888
Cost:
$10,500
- - - - - - - - - - - - $(-14,112) - - - - - - - $19,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$(-14,112)
-
$
-
-
$
-
-
$
-
-
$
$19,000
-
$
-
-
$
11: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$93,603
Cost:
$14,305
$(-1,865) (-40,445) $(-922) (-243) - - - - - - - - $17,640 - - - $78,750 - - - - - - - $(-1,865)
(-40,445)
kWh
$(-922)
(-243)
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$17,640
-
$
-
-
$
$78,750
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$118,656
Cost:
$47,437
$2,761 62,719 $1,297 343 $(-2,240) (-376) $498 120,000 $9,346 1,490 $2,068 142,600 $6,678 - $(-322) - $78,750 - $107 - $19,000 - $713 - $2,761
62,719
kWh
$1,297
343
kW-months/year
$(-2,240)
(-376)
MMBtu
$498
120,000
Tgal
$9,346
1,490
gal
$2,068
142,600
lb
$6,678
-
$
$(-322)
-
$
$78,750
-
$
$107
-
$
$19,000
-
$
$713
-
$
TOTAL IMPLEMENTED Savings:
$15,386
Cost:
$20,881
$4,193 93,786 $2,183 576 $(-2,092) (-351) $498 120,000 - - $2,068 142,600 $(-10,962) - $(-322) - - - $107 - $19,000 - $713 - $4,193
93,786
kWh
$2,183
576
kW-months/year
$(-2,092)
(-351)
MMBtu
$498
120,000
Tgal
-
-
gal
$2,068
142,600
lb
$(-10,962)
-
$
$(-322)
-
$
-
-
$
$107
-
$
$19,000
-
$
$713
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb $ $ $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product By-product Production