Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1997 |
Principal Product | mirrors |
NAICS | n/a |
SIC | 3231 - Products Of Purchased Glass |
Sales | $10,000,000-$50,000,000 |
# of Employees | 105 |
Plant Area (Sq.Ft.) | 90,060 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $126,813 | 2,883,060 | kWh | $0.04 |
Electricity Demand | $47,079 | 13,646 | kW-months/year | $3.45 |
Electricity Fees | $8,140 | - | $ | - |
Natural Gas | $53,475 | 8,647 | MMBtu | $6.18 |
TOTAL ENERGY COSTS | $272,649 | |||
RECOMMENDED SAVINGS* | $105,026 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,460 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $1,591 Cost: $647 |
$1,082 | 24,619 | $509 | 148 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,082 24,619 kWh |
$509 148 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $884 Cost: $468 |
- | - | - | - | $884 | 92 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$884 92 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS |
Savings: $831 Cost: $1,000 |
$831 | 18,757 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$831 18,757 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,262 Cost: $600 |
- | - | - | - | $2,262 | 366 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,262 366 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $2,108 Cost: $3,500 |
$1,707 | 38,687 | $401 | 116 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,707 38,687 kWh |
$401 116 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1224 REPLACE BOILER |
Savings: $8,881 Cost: $36,000 |
- | - | - | - | $8,281 | 1,340 | - | - | - | - | $600 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,281 1,340 MMBtu |
- - Tgal |
- - lb |
$600 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $973 Cost: $1,500 |
$973 | 21,981 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$973 21,981 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $12,101 Cost: $2,500 |
- | - | - | - | $6,149 | 995 | $5,952 | 2,400,000 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,149 995 MMBtu |
$5,952 2,400,000 Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $27,463 Cost: $13,500 |
$(-227) | (-5,275) | - | - | - | - | - | - | $27,690 | 1,560,000 | - | - | - | - | - | - |
$(-227) (-5,275) kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$27,690 1,560,000 lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $2,157 Cost: $400 |
- | - | - | - | - | - | - | - | $3,157 | 138,800 | $(-1,000) | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$3,157 138,800 lb |
$(-1,000) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $36,445 Cost: $100,000 |
$(-388) | (-8,792) | $(-167) | (-48) | - | - | - | - | - | - | $32,000 | - | $5,000 | - | - | - |
$(-388) (-8,792) kWh |
$(-167) (-48) kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$32,000 - $ |
$5,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE |
Savings: $9,330 Cost: $3,330 |
- | - | - | - | - | - | - | - | $(-370) | (-20,845) | $(-300) | - | - | - | $10,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$(-370) (-20,845) lb |
$(-300) - $ |
- - $ |
$10,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $105,026 Cost: $163,445 |
$3,978 | 89,977 | $743 | 216 | $17,576 | 2,793 | $5,952 | 2,400,000 | $30,477 | 1,677,955 | $31,300 | - | $5,000 | - | $10,000 | - | $3,978 89,977 kWh |
$743 216 kW-months/year |
$17,576 2,793 MMBtu |
$5,952 2,400,000 Tgal |
$30,477 1,677,955 lb |
$31,300 - $ |
$5,000 - $ |
$10,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,460 Cost: $5,230 |
$973 | 21,981 | - | - | - | - | - | - | $2,787 | 117,955 | $(-1,300) | - | - | - | $10,000 | - | $973 21,981 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,787 117,955 lb |
$(-1,300) - $ |
- - $ |
$10,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Primary Product |