IAC logo
IAC Assessment: NC0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1997
Principal Product mirrors
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 90,060
Annual Production 500,000 Pieces
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,813 2,883,060 kWh $0.04
Electricity Demand $47,079 13,646 kW-months/year $3.45
Electricity Fees $8,140 - $ -
Natural Gas $53,475 8,647 MMBtu $6.18
TOTAL ENERGY COSTS $272,649
RECOMMENDED SAVINGS* $105,026 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,460
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
01: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,591
Cost:
$647
$1,082 24,619 $509 148 - - - - - - - - - - - - $1,082
24,619
kWh
$509
148
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$884
Cost:
$468
- - - - $884 92 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$884
92
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$831
Cost:
$1,000
$831 18,757 - - - - - - - - - - - - - - $831
18,757
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,262
Cost:
$600
- - - - $2,262 366 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,262
366
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$2,108
Cost:
$3,500
$1,707 38,687 $401 116 - - - - - - - - - - - - $1,707
38,687
kWh
$401
116
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.1224 REPLACE BOILER Savings:
$8,881
Cost:
$36,000
- - - - $8,281 1,340 - - - - $600 - - - - - -
-
kWh
-
-
kW-months/year
$8,281
1,340
MMBtu
-
-
Tgal
-
-
lb
$600
-
$
-
-
$
-
-
$
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$973
Cost:
$1,500
$973 21,981 - - - - - - - - - - - - - - $973
21,981
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
08: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$12,101
Cost:
$2,500
- - - - $6,149 995 $5,952 2,400,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
$6,149
995
MMBtu
$5,952
2,400,000
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
09: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$27,463
Cost:
$13,500
$(-227) (-5,275) - - - - - - $27,690 1,560,000 - - - - - - $(-227)
(-5,275)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$27,690
1,560,000
lb
-
-
$
-
-
$
-
-
$
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,157
Cost:
$400
- - - - - - - - $3,157 138,800 $(-1,000) - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$3,157
138,800
lb
$(-1,000)
-
$
-
-
$
-
-
$
11: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$36,445
Cost:
$100,000
$(-388) (-8,792) $(-167) (-48) - - - - - - $32,000 - $5,000 - - - $(-388)
(-8,792)
kWh
$(-167)
(-48)
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$32,000
-
$
$5,000
-
$
-
-
$
12: 4.5110 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$9,330
Cost:
$3,330
- - - - - - - - $(-370) (-20,845) $(-300) - - - $10,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-370)
(-20,845)
lb
$(-300)
-
$
-
-
$
$10,000
-
$
TOTAL RECOMMENDED Savings:
$105,026
Cost:
$163,445
$3,978 89,977 $743 216 $17,576 2,793 $5,952 2,400,000 $30,477 1,677,955 $31,300 - $5,000 - $10,000 - $3,978
89,977
kWh
$743
216
kW-months/year
$17,576
2,793
MMBtu
$5,952
2,400,000
Tgal
$30,477
1,677,955
lb
$31,300
-
$
$5,000
-
$
$10,000
-
$
TOTAL IMPLEMENTED Savings:
$12,460
Cost:
$5,230
$973 21,981 - - - - - - $2,787 117,955 $(-1,300) - - - $10,000 - $973
21,981
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,787
117,955
lb
$(-1,300)
-
$
-
-
$
$10,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product