Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1997 |
Principal Product | Cases for electronics |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 13,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $61,824 | 1,546,014 | kWh | $0.04 |
Electricity Demand | $38,097 | 4,646 | kW-months/year | $8.20 |
LPG | $16,571 | 1,397 | MMBtu | $11.86 |
TOTAL ENERGY COSTS | $138,913 | |||
RECOMMENDED SAVINGS* | $157,232 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $128,137 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Increase in Production | Electricity Usage | Electricity Demand | LPG | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,987 Cost: - |
$1,987 | 49,824 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$1,987 49,824 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $953 Cost: $450 |
$590 | 14,654 | $363 | 44 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$590 14,654 kWh |
$363 44 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7131 ADD AREA LIGHTING SWITCHES |
Savings: $1,475 Cost: $2,000 |
$1,475 | 36,928 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$1,475 36,928 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $126 Cost: $25 |
$78 | 2,052 | $48 | 6 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$78 2,052 kWh |
$48 6 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $376 Cost: $400 |
$256 | 6,448 | $120 | 15 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$256 6,448 kWh |
$120 15 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $7,282 Cost: $14,319 |
$(-946) | (-23,740) | $(-465) | (-57) | $8,693 | 733 | - | - | - | - | - | - | - | - | - | - | - | - |
$(-946) (-23,740) kWh |
$(-465) (-57) kW-months/year |
$8,693 733 MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1222 REDUCE WATER USE WITH COUNTER CURRENT RINSING |
Savings: $926 Cost: $200 |
- | - | - | - | - | - | $926 | 240,000 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$926 240,000 Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS |
Savings: $14,528 Cost: $12,000 |
$(-256) | (-6,448) | - | - | - | - | - | - | $14,784 | 5,082 | - | - | - | - | - | - | - | - |
$(-256) (-6,448) kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$14,784 5,082 gal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $3,429 Cost: $15,000 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $3,429 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
$3,429 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $375 Cost: $200 |
- | - | - | - | - | - | - | - | - | - | $375 | 25,000 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$375 25,000 lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE |
Savings: $10,775 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | $10,775 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
$10,775 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $115,000 Cost: $200,000 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | $115,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
$115,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $157,232 Cost: $244,594 |
$3,184 | 79,718 | $66 | 8 | $8,693 | 733 | $926 | 240,000 | $14,784 | 5,082 | $375 | 25,000 | $10,775 | - | $3,429 | - | $115,000 | - | $3,184 79,718 kWh |
$66 8 kW-months/year |
$8,693 733 MMBtu |
$926 240,000 Tgal |
$14,784 5,082 gal |
$375 25,000 lb |
$10,775 - $ |
$3,429 - $ |
$115,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $128,137 Cost: $200,200 |
$1,987 | 49,824 | - | - | - | - | - | - | - | - | $375 | 25,000 | $10,775 | - | - | - | $115,000 | - | $1,987 49,824 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$375 25,000 lb |
$10,775 - $ |
- - $ |
$115,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Increase in Production | Electricity Usage | Electricity Demand | LPG | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Increase in Production |