IAC Assessment: NC0139
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0139
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1998
Principal Product Aluminum foil
NAICS n/a
SIC 3353 - Aluminum Sheet, Plate, And Foil
Sales $100,000,000-$500,000,000
# of Employees 286
Plant Area (Sq.Ft.) 200,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,005,042 39,118,113 kWh $0.03
Electricity Demand $567,223 66,110 kW-months/year $8.58
Electricity Fees $45,146 - $ -
Natural Gas $2,026,000 516,448 MMBtu $3.92
TOTAL ENERGY COSTS $3,686,911
RECOMMENDED SAVINGS* $523,401 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,424
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Increase in Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Increase in Production
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ %
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,306
Cost:
$18,000
$10,506 183,763 $3,800 140 - - - - - - - - $10,506
183,763
kWh
$3,800
140
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
%
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,424
Cost:
$1,800
$2,354 91,735 $1,070 125 - - - - - - - - $2,354
91,735
kWh
$1,070
125
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
%
03: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$34,875
Cost:
$2,500
$(-388) (-15,240) $(-175) (-20) $35,438 9,040 - - - - - - $(-388)
(-15,240)
kWh
$(-175)
(-20)
kW-months/year
$35,438
9,040
MMBtu
-
-
gal
-
-
lb
-
-
%
04: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$5,815
Cost:
$25,000
$(-925) (-36,049) $(-422) (-49) $7,162 1,827 - - - - - - $(-925)
(-36,049)
kWh
$(-422)
(-49)
kW-months/year
$7,162
1,827
MMBtu
-
-
gal
-
-
lb
-
-
%
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$42,277
Cost:
$70,000
$14,771 575,029 $7,506 875 - - - - $20,000 2,800 - - $14,771
575,029
kWh
$7,506
875
kW-months/year
-
-
MMBtu
-
-
gal
$20,000
2,800
lb
-
-
%
06: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$4,704
Cost:
$4,000
- - - - - - $4,704 8,400 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,704
8,400
gal
-
-
lb
-
-
%
07: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$418,000
Cost:
$750,000
- - - - - - - - - - $418,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$418,000
-
%
TOTAL RECOMMENDED Savings:
$523,401
Cost:
$871,300
$26,318 799,238 $11,779 1,071 $42,600 10,867 $4,704 8,400 $20,000 2,800 $418,000 - $26,318
799,238
kWh
$11,779
1,071
kW-months/year
$42,600
10,867
MMBtu
$4,704
8,400
gal
$20,000
2,800
lb
$418,000
-
%
TOTAL IMPLEMENTED Savings:
$3,424
Cost:
$1,800
$2,354 91,735 $1,070 125 - - - - - - - - $2,354
91,735
kWh
$1,070
125
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ %
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Increase in Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Increase in Production